Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Lehigh University
Assessment Year 2011
Principal Product Medical Devices
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 102,000
Annual Production 2,000 Pieces
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $319,682 4,425,000 kWh $0.07
Electricity Demand $41,764 9,040 kW-months/year $4.62
Natural Gas $130,846 13,984 MMBtu $9.36
TOTAL ENERGY COSTS $492,292
RECOMMENDED SAVINGS* $222,068 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,195
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$148,547
Cost:
$900,000
$114,851 1,595,160 - - $33,696 3,600 - - $114,851
1,595,160
kWh
-
-
kW-months/year
$33,696
3,600
MMBtu
-
-
$
02: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$52,419
Cost:
$21,000
- - - - $52,419 5,600 - - -
-
kWh
-
-
kW-months/year
$52,419
5,600
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,249
Cost:
$15,615
$6,236 86,611 $772 167 - - $241 - $6,236
86,611
kWh
$772
167
kW-months/year
-
-
MMBtu
$241
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,438
Cost:
-
$3,544 49,216 $1,894 410 - - - - $3,544
49,216
kWh
$1,894
410
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,946
Cost:
$6,396
$2,480 34,444 $305 66 - - $161 - $2,480
34,444
kWh
$305
66
kW-months/year
-
-
MMBtu
$161
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,815
Cost:
$15,840
$2,395 33,528 $420 91 - - - - $2,395
33,528
kWh
$420
91
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,654
Cost:
$1,955
$2,396 33,279 $203 44 - - $55 - $2,396
33,279
kWh
$203
44
kW-months/year
-
-
MMBtu
$55
-
$
TOTAL RECOMMENDED Savings:
$222,068
Cost:
$960,806
$131,902 1,832,238 $3,594 778 $86,115 9,200 $457 - $131,902
1,832,238
kWh
$3,594
778
kW-months/year
$86,115
9,200
MMBtu
$457
-
$
TOTAL IMPLEMENTED Savings:
$10,195
Cost:
$22,011
$8,716 121,055 $1,077 233 - - $402 - $8,716
121,055
kWh
$1,077
233
kW-months/year
-
-
MMBtu
$402
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $