Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,223
matching recommendationsNAICS | 33911 | Medical Equipment and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0840 # 06 Y:2022 | 06 | 2022 | INSULATE BARE EQUIPMENT | $1,204 | $706 | Not Implemented |
MA0840 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,239 | $3,220 | Not Implemented |
UU0201 # 01 Y:2022 | 01 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $19,186 | $1,125 | Implemented |
UU0201 # 02 Y:2022 | 02 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $14,352 | $8,000 | Implemented |
UU0201 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,786 | $1,000 | Implemented |
UU0201 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $771 | $1,550 | Not Implemented |
UU0201 # 05 Y:2022 | 05 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $730 | $500 | Implemented |
UU0201 # 06 Y:2022 | 06 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $307 | $329 | Not Implemented |
MI0405 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $51,243 | $208,000 | Implemented |
MI0405 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,714 | $39,398 | Implemented |
MI0405 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO HEAT WATER | $22,766 | $62,612 | Not Implemented |
MI0405 # 04 Y:2022 | 04 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,041 | $580 | Not Implemented |
MI0405 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $3,954 | $3,600 | Implemented |
MI0405 # 06 Y:2022 | 06 | 2022 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $874 | $900 | Not Implemented |
IC0255 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,386 | $15,632 | Implemented |
IC0255 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,458 | $1,710 | Not Implemented |
IC0255 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,153 | $4,100 | Implemented |
UU0199 # 01 Y:2022 | 01 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $9,239 | $4,868 | Implemented |
UU0199 # 02 Y:2022 | 02 | 2022 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $6,969 | $37,350 | Not Implemented |
UU0199 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,884 | $378 | Not Implemented |
UU0199 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,264 | $2,575 | Implemented |
UU0199 # 05 Y:2022 | 05 | 2022 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $200 | $564 | Not Implemented |
MI0388 # 01 Y:2021 | 01 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $132,105 | $960 | Not Implemented |
MI0388 # 02 Y:2021 | 02 | 2021 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $86,796 | $86,796 | Not Implemented |
MI0388 # 03 Y:2021 | 03 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $32,022 | $38,081 | Implemented |