IAC logo
IAC Assessment: UF0584
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0584
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Surgical Implants (Allografts)
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 65,000
Annual Production 13,849 Units
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $688,493 10,259,600 kWh $0.07
Electricity Demand $138,902 18,860 kW-months/year $7.36
Electricity Fees $200,453 - $ -
TOTAL ENERGY COSTS $1,069,551
RECOMMENDED SAVINGS* $903,430 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $78,348
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$544,931
Cost:
$1,699,000
$656,552 9,799,282 $88,380 12,000 $(-115,001) (-82,863) $(-85,000) - $656,552
9,799,282
kWh
$88,380
12,000
kW-months/year
$(-115,001)
(-82,863)
MMBtu
$(-85,000)
-
$
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$73,209
Cost:
$322,608
$44,927 670,555 $28,282 3,840 - - - - $44,927
670,555
kWh
$28,282
3,840
kW-months/year
-
-
MMBtu
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$57,843
Cost:
$55,197
$48,118 718,172 $9,725 1,321 - - - - $48,118
718,172
kWh
$9,725
1,321
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$56,623
Cost:
$65,000
$56,623 845,126 - - - - - - $56,623
845,126
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$10,250
Cost:
$160
$10,250 152,989 - - - - - - $10,250
152,989
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2623 MINIMIZE CONDENSER COOLING WATER TEMPERATURE Savings:
$10,226
Cost:
$7,600
$10,226 152,625 - - - - - - $10,226
152,625
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,855
Cost:
$40,432
$7,204 107,521 $2,651 360 - - - - $7,204
107,521
kWh
$2,651
360
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,261
Cost:
$3,420
$2,515 37,537 $746 101 - - - - $2,515
37,537
kWh
$746
101
kW-months/year
-
-
MMBtu
-
-
$
09: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$68,739
Cost:
$10,000
$68,739 1,025,960 - - - - - - $68,739
1,025,960
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$68,493
Cost:
-
- - - - - - $68,493 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$68,493
-
$
TOTAL RECOMMENDED Savings:
$903,430
Cost:
$2,203,417
$905,154 13,509,767 $129,784 17,622 $(-115,001) (-82,863) $(-16,507) - $905,154
13,509,767
kWh
$129,784
17,622
kW-months/year
$(-115,001)
(-82,863)
MMBtu
$(-16,507)
-
$
TOTAL IMPLEMENTED Savings:
$78,348
Cost:
$40,432
$7,204 107,521 $2,651 360 - - $68,493 - $7,204
107,521
kWh
$2,651
360
kW-months/year
-
-
MMBtu
$68,493
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes