Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,223
matching recommendationsNAICS | 33911 | Medical Equipment and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0233 # 11 Y:2012 | 11 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,084 | $80 | Implemented |
MI0233 # 12 Y:2012 | 12 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,056 | $843 | Implemented |
MI0230 # 14 Y:2012 | 14 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,550 | $40 | Implemented |
MI0230 # 01 Y:2012 | 01 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $185,551 | $480 | Implemented |
MI0230 # 13 Y:2012 | 13 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,524 | $80 | Not Implemented |
MI0230 # 12 Y:2012 | 12 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,487 | $2,848 | Implemented |
MI0230 # 11 Y:2012 | 11 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,581 | $3,569 | Not Implemented |
MI0230 # 10 Y:2012 | 10 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,962 | $1,589 | Implemented |
MI0230 # 09 Y:2012 | 09 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,652 | $6,802 | Not Implemented |
MI0230 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,512 | $1,040 | Implemented |
MI0230 # 07 Y:2012 | 07 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $15,150 | $4,720 | Not Implemented |
MI0230 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,707 | $1,660 | Implemented |
MI0230 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,101 | $41,600 | Implemented |
MI0230 # 04 Y:2012 | 04 | 2012 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $64,249 | $12,488 | Not Implemented |
MI0230 # 03 Y:2012 | 03 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $88,716 | $46,097 | Implemented |
MI0230 # 02 Y:2012 | 02 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $146,160 | $70,200 | Not Implemented |
MI0230 # 15 Y:2012 | 15 | 2012 | INSTALL OCCUPANCY SENSORS | $2,794 | $320 | Implemented |
MI0230 # 16 Y:2012 | 16 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,194 | $3,160 | Not Implemented |
AM0617 # 01 Y:2012 | 01 | 2012 | DEVELOP STANDARD OPERATING PROCEDURES | $191,786 | $6,200 | Not Implemented |
AM0617 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $153,000 | $375,000 | Not Implemented |
AM0617 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,264 | $2,775 | Implemented |
AM0617 # 04 Y:2012 | 04 | 2012 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $2,146 | $0 | Implemented |
AM0617 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $2,056 | $1,562 | Implemented |
AM0617 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,871 | $64 | Implemented |
AM0617 # 07 Y:2012 | 07 | 2012 | RECYCLE WHITE WATER | $1,161 | $7,179 | Implemented |