Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,223
matching recommendationsNAICS | 33911 | Medical Equipment and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0434 # 09 Y:2010 | 09 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,310 | $20,000 | Not Implemented |
UF0434 # 10 Y:2010 | 10 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,649 | $232 | Not Implemented |
UF0434 # 11 Y:2010 | 11 | 2010 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,515 | $7,701 | Not Implemented |
UF0434 # 12 Y:2010 | 12 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,125 | $2,284 | Not Implemented |
UF0434 # 13 Y:2010 | 13 | 2010 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $1,875 | $10,480 | Not Implemented |
UF0434 # 14 Y:2010 | 14 | 2010 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $11,568 | $0 | Not Implemented |
UF0434 # 15 Y:2010 | 15 | 2010 | RECYCLE FLUORESCENT LAMPS | $571 | $3,405 | Not Implemented |
MA0662 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,395 | $2,265 | Implemented |
MA0662 # 02 Y:2010 | 02 | 2010 | REDUCE VENTILATION AIR | $2,158 | $3,935 | Implemented |
MA0662 # 03 Y:2010 | 03 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,305 | $4,995 | Not Implemented |
MA0662 # 04 Y:2010 | 04 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,287 | $5,324 | Not Implemented |
MA0662 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $1,011 | $1,760 | Implemented |
MA0662 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $883 | $1,500 | Implemented |
MA0662 # 07 Y:2010 | 07 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $680 | $2,000 | Implemented |
MA0662 # 08 Y:2010 | 08 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $644 | $640 | Implemented |
MA0662 # 09 Y:2010 | 09 | 2010 | INSTALL OCCUPANCY SENSORS | $547 | $1,740 | Implemented |
IC0166 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,511 | $10,994 | Implemented |
IC0166 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,135 | $4,045 | Not Implemented |
IC0166 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $757 | $136 | Not Implemented |
IC0166 # 04 Y:2009 | 04 | 2009 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,442 | $1,720 | Not Implemented |
IC0166 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $84 | $345 | Implemented |
IC0166 # 06 Y:2009 | 06 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $134 | $0 | Implemented |
IC0166 # 07 Y:2009 | 07 | 2009 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $3,264 | $16,200 | Not Implemented |
IC0166 # 08 Y:2009 | 08 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $659 | $0 | Not Implemented |
MA0650 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,218 | $10,000 | Not Implemented |