IAC logo
IAC Assessment: UF0436
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0436
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2010
Principal Product xenograft and allograft products
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 133,072
Annual Production 465,000 Pieces
Production Hrs. Annual 6,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,440,093 14,966,519 kWh $0.10
Electricity Demand $208,365 31,075 kW-months/year $6.71
Natural Gas $197,295 18,152 MMBtu $10.87
TOTAL ENERGY COSTS $1,845,753
RECOMMENDED SAVINGS* $100,769 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,859
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$493
Cost:
$388
- - - - $493 44 -
-
kWh
-
-
kW-months/year
$493
44
MMBtu
02: 2.1222 INSTALL TURBULATORS Savings:
$4,953
Cost:
$7,500
- - - - $4,953 495 -
-
kWh
-
-
kW-months/year
$4,953
495
MMBtu
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$27,623
Cost:
$20,280
- - - - $27,623 2,540 -
-
kWh
-
-
kW-months/year
$27,623
2,540
MMBtu
04: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$13,947
Cost:
$350
$11,339 118,113 $2,608 10 - - $11,339
118,113
kWh
$2,608
10
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,376
Cost:
$1,782
$1,354 24,486 $1,022 4 - - $1,354
24,486
kWh
$1,022
4
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,758
Cost:
$524
$1,758 18,319 - - - - $1,758
18,319
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$811
Cost:
$895
$811 8,452 - - - - $811
8,452
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$19,232
Cost:
$26,795
$16,912 176,165 $2,320 29 - - $16,912
176,165
kWh
$2,320
29
kW-months/year
-
-
MMBtu
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$29,576
Cost:
$10,400
$29,576 268,874 - - - - $29,576
268,874
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$100,769
Cost:
$68,914
$61,750 614,409 $5,950 43 $33,069 3,079 $61,750
614,409
kWh
$5,950
43
kW-months/year
$33,069
3,079
MMBtu
TOTAL IMPLEMENTED Savings:
$36,859
Cost:
$30,210
$30,416 327,216 $5,950 43 $493 44 $30,416
327,216
kWh
$5,950
43
kW-months/year
$493
44
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas