IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 339112 Surgical and Medical Instrument Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0789 # 04 Y:2018 04 2018 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $2,881 $6,120 Not Implemented
MA0789 # 03 Y:2018 03 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,660 $1,200 Not Implemented
MA0789 # 02 Y:2018 02 2018 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $9,053 $960 Not Implemented
MA0789 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,415 $29,288 Implemented
MA0662 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,287 $5,324 Not Implemented
MA0662 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,395 $2,265 Implemented
MA0662 # 02 Y:2010 02 2010 REDUCE VENTILATION AIR $2,158 $3,935 Implemented
MA0662 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,305 $4,995 Not Implemented
MA0662 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $1,011 $1,760 Implemented
MA0662 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $883 $1,500 Implemented
MA0662 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $680 $2,000 Implemented
MA0662 # 08 Y:2010 08 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $644 $640 Implemented
MA0662 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $547 $1,740 Implemented
MA0589 # 01 Y:2006 01 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $29,215 $95,420 Not Implemented
MA0589 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $177 $800 Implemented
MA0589 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $187 $60 Implemented
MA0589 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $2,060 $1,800 Implemented
MA0589 # 06 Y:2006 06 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,951 $400 Implemented
MA0589 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,311 $3,565 Implemented
MA0589 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,608 $10,890 Not Implemented
MA0589 # 03 Y:2006 03 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,300 $4,000 Implemented
MA0589 # 02 Y:2006 02 2006 USE MINIMUM SAFE OVEN VENTILATION $13,600 $1,600 Not Implemented