IAC Assessment: MA0589
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0589
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2006
Principal Product Silicone mouldings and hoses
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 66
Plant Area (Sq.Ft.) 22,000
Annual Production 363 Tons
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,578 1,783,200 kWh $0.06
Electricity Demand $67,192 6,078 kW-months/year $11.05
Electricity Fees $6,106 - $ -
Natural Gas $17,399 1,297 MMBtu $13.41
TOTAL ENERGY COSTS $193,275
RECOMMENDED SAVINGS* $55,409 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,986
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$29,215
Cost:
$95,420
$31,900 550,080 $23,750 1,920 $(-26,435) (-2,035) $31,900
550,080
kWh
$23,750
1,920
kW-months/year
$(-26,435)
(-2,035)
MMBtu
02: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$13,600
Cost:
$1,600
$13,600 234,800 - - - - $13,600
234,800
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,300
Cost:
$4,000
$3,300 57,300 - - - - $3,300
57,300
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,608
Cost:
$10,890
$357 6,154 $2,251 182 - - $357
6,154
kWh
$2,251
182
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,311
Cost:
$3,565
$663 11,426 $297 24 $1,351 104 $663
11,426
kWh
$297
24
kW-months/year
$1,351
104
MMBtu
06: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$1,951
Cost:
$400
$1,951 33,650 - - - - $1,951
33,650
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,060
Cost:
$1,800
$1,931 23,987 $714 58 $(-585) (-45) $1,931
23,987
kWh
$714
58
kW-months/year
$(-585)
(-45)
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$187
Cost:
$60
$63 1,085 $124 10 - - $63
1,085
kWh
$124
10
kW-months/year
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$177
Cost:
$800
$110 1,900 $67 5 - - $110
1,900
kWh
$67
5
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$55,409
Cost:
$118,535
$53,875 920,382 $27,203 2,199 $(-25,669) (-1,976) $53,875
920,382
kWh
$27,203
2,199
kW-months/year
$(-25,669)
(-1,976)
MMBtu
TOTAL IMPLEMENTED Savings:
$9,986
Cost:
$10,625
$8,018 129,348 $1,202 97 $766 59 $8,018
129,348
kWh
$1,202
97
kW-months/year
$766
59
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas