Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
733
matching recommendationsNAICS | 339112 | Surgical and Medical Instrument Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0111 # 02 Y:2005 | 02 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,290 | $84 | Implemented |
MI0111 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,062 | $7,706 | Implemented |
MI0111 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,249 | $0 | Not Implemented |
MI0111 # 05 Y:2005 | 05 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $873 | $1,673 | Not Implemented |
UU0084 # 01 Y:2005 | 01 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,643 | $6,171 | Not Implemented |
UU0084 # 02 Y:2005 | 02 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $697 | $2,150 | Not Implemented |
UU0084 # 03 Y:2005 | 03 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,537 | $0 | Not Implemented |
UU0084 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $506 | $235 | Not Implemented |
UU0084 # 05 Y:2005 | 05 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $491 | $200 | Not Implemented |
UU0084 # 06 Y:2005 | 06 | 2005 | OPTIMIZE PLANT POWER FACTOR | $4,429 | $5,220 | Not Implemented |
UU0084 # 07 Y:2005 | 07 | 2005 | COMBINE UTILITY METERS | $575 | $315 | Not Implemented |
IA0361 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $781 | $25 | Not Implemented |
IA0361 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,729 | $429 | Implemented |
IA0361 # 03 Y:2005 | 03 | 2005 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $919 | $172 | Implemented |
IA0361 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,960 | $1,114 | Implemented |
IA0361 # 05 Y:2005 | 05 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $421 | $850 | Implemented |
IA0361 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $577 | $1,080 | Not Implemented |
SF0295 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,378 | $0 | Implemented |
SF0295 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,565 | $7,217 | Implemented |
SF0295 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,204 | $4,525 | Not Implemented |
SF0295 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,996 | $5,126 | Implemented |
SF0295 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $159 | $250 | Not Implemented |
SF0295 # 06 Y:2004 | 06 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $23,382 | $48,990 | Not Implemented |
SF0295 # 07 Y:2004 | 07 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $529 | $3,076 | Not Implemented |
LE0198 # 01 Y:2004 | 01 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $20,168 | $76,950 | n/a |