Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
131
matching recommendationsNAICS | 339112 | Surgical and Medical Instrument Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0429 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,739 | $1,660 | Implemented |
MI0429 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $172,404 | $974,914 | Not Implemented |
MI0429 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,831 | $6,950 | Not Implemented |
MI0429 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $16,344 | $70,840 | Not Implemented |
MI0429 # 03 Y:2023 | 03 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $25,267 | $0 | Not Implemented |
MI0429 # 08 Y:2023 | 08 | 2023 | INSULATE BARE EQUIPMENT | $1,608 | $1,012 | Not Implemented |
MI0429 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO HEAT WATER | $1,687 | $8,166 | Not Implemented |
MI0429 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,166 | $12,997 | Implemented |
UF0589 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $71,810 | $25,340 | Implemented |
UF0589 # 12 Y:2023 | 12 | 2023 | INSTALL TURBULATORS | $4,595 | $7,500 | Implemented |
UF0589 # 16 Y:2023 | 16 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,322 | $0 | Implemented |
UF0589 # 17 Y:2023 | 17 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $88,974 | $10,000 | Implemented |
UF0589 # 15 Y:2023 | 15 | 2023 | INSTALL OCCUPANCY SENSORS | $2,868 | $9,968 | Implemented |
UF0589 # 08 Y:2023 | 08 | 2023 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $13,274 | $30,000 | Implemented |
UF0589 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,787 | $43,077 | Implemented |
UF0589 # 03 Y:2023 | 03 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $130,403 | $95,736 | Not Implemented |
UF0589 # 14 Y:2023 | 14 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,316 | $3,069 | Implemented |
UF0589 # 07 Y:2023 | 07 | 2023 | CLEAN CONDENSER TUBES | $15,589 | $0 | Implemented |
UF0589 # 02 Y:2023 | 02 | 2023 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $505,092 | $2,115,660 | Implemented |
UF0589 # 11 Y:2023 | 11 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,770 | $2,800 | Implemented |
UF0589 # 13 Y:2023 | 13 | 2023 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $4,532 | $754 | Implemented |
UF0589 # 09 Y:2023 | 09 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,438 | $0 | Implemented |
UF0589 # 10 Y:2023 | 10 | 2023 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $5,304 | $4,300 | Implemented |
UF0589 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $920,434 | $2,793,000 | Implemented |
UF0589 # 06 Y:2023 | 06 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $18,200 | $14,400 | Implemented |