IAC Assessment: UF0589
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2023
Principal Product Ophthalmic Medication
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 175,677
Annual Production 65,000,000 Units
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $885,582 17,794,789 kWh $0.05
Electricity Demand $414,289 30,331 kW-months/year $13.66
Electricity Fees $214,588 - $ -
Natural Gas $159,004 57,394 MMBtu $2.77
TOTAL ENERGY COSTS $1,900,581
RECOMMENDED SAVINGS* $1,840,708 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,710,305
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$920,434
Cost:
$2,793,000
$889,739 17,794,789 $344,207 25,200 - - $(-327,887) (-118,328) $14,375 - $889,739
17,794,789
kWh
$344,207
25,200
kW-months/year
-
-
$
$(-327,887)
(-118,328)
MMBtu
$14,375
-
$
02: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING Savings:
$505,092
Cost:
$2,115,660
$306,633 6,132,668 - - $198,459 - - - - - $306,633
6,132,668
kWh
-
-
kW-months/year
$198,459
-
$
-
-
MMBtu
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$130,403
Cost:
$95,736
$88,974 1,779,479 $41,429 3,033 - - - - - - $88,974
1,779,479
kWh
$41,429
3,033
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$71,810
Cost:
$25,340
$71,810 1,436,203 - - - - - - - - $71,810
1,436,203
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$42,787
Cost:
$43,077
$30,363 607,262 $12,424 910 - - - - - - $30,363
607,262
kWh
$12,424
910
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$18,200
Cost:
$14,400
$18,200 364,000 - - - - - - - - $18,200
364,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.2615 CLEAN CONDENSER TUBES Savings:
$15,589
Cost:
-
$15,589 311,786 - - - - - - - - $15,589
311,786
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$13,274
Cost:
$30,000
- - - - - - $13,274 4,792 - - -
-
kWh
-
-
kW-months/year
-
-
$
$13,274
4,792
MMBtu
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,438
Cost:
-
$5,438 108,767 - - - - - - - - $5,438
108,767
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$5,304
Cost:
$4,300
$5,304 106,071 - - - - - - - - $5,304
106,071
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
11: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$4,770
Cost:
$2,800
- - - - - - $4,770 1,722 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,770
1,722
MMBtu
-
-
$
12: 2.1222 INSTALL TURBULATORS Savings:
$4,595
Cost:
$7,500
- - - - - - $4,595 1,659 - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,595
1,659
MMBtu
-
-
$
13: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$4,532
Cost:
$754
$4,532 90,639 - - - - - - - - $4,532
90,639
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
14: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$4,316
Cost:
$3,069
$4,316 86,326 - - - - - - - - $4,316
86,326
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
15: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,868
Cost:
$9,968
$2,868 57,363 - - - - - - - - $2,868
57,363
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
16: 2.7272 INSTALL HEAT PIPES / RAISE COOLING SETPOINT Savings:
$2,322
Cost:
-
$2,322 46,443 - - - - - - - - $2,322
46,443
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
17: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$88,974
Cost:
$10,000
$88,974 1,779,479 - - - - - - - - $88,974
1,779,479
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,840,708
Cost:
$5,155,604
$1,535,062 30,701,275 $398,060 29,143 $198,459 - $(-305,248) (-110,155) $14,375 - $1,535,062
30,701,275
kWh
$398,060
29,143
kW-months/year
$198,459
-
$
$(-305,248)
(-110,155)
MMBtu
$14,375
-
$
TOTAL IMPLEMENTED Savings:
$1,710,305
Cost:
$5,059,868
$1,446,088 28,921,796 $356,631 26,110 $198,459 - $(-305,248) (-110,155) $14,375 - $1,446,088
28,921,796
kWh
$356,631
26,110
kW-months/year
$198,459
-
$
$(-305,248)
(-110,155)
MMBtu
$14,375
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost