IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 339113 Surgical Appliance and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0209 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,279 $1,600 Implemented
UU0209 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,311 $900 Implemented
UU0209 # 05 Y:2022 05 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,347 $1,395 Implemented
UU0209 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,767 $6,406 Not Implemented
UU0209 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,247 $850 Not Implemented
UU0209 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,206 $5,920 Implemented
UU0209 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,593 $20,930 Not Implemented
UF0584 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,855 $40,432 Implemented
UF0584 # 10 Y:2022 10 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $68,493 $0 Implemented
UF0584 # 09 Y:2022 09 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $68,739 $10,000 Not Implemented
UF0584 # 08 Y:2022 08 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,261 $3,420 Not Implemented
UF0584 # 06 Y:2022 06 2022 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $10,226 $7,600 Not Implemented
UF0584 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,250 $160 Not Implemented
UF0584 # 04 Y:2022 04 2022 LOWER CEILING TO REDUCE CONDITIONED SPACE $56,623 $65,000 Not Implemented
UF0584 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $57,843 $55,197 Not Implemented
UF0584 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $73,209 $322,608 Not Implemented
UF0584 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $544,931 $1,699,000 Not Implemented
MZ0334 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,329 $7,000 Not Implemented
MZ0334 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $675 $32 Not Implemented
MZ0334 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,158 $1,280 Not Implemented
MZ0334 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,140 $7,780 Not Implemented