Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
100
matching recommendationsNAICS | 339115 | Ophthalmic Goods Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1101 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,997 | $6,792 | n/a |
UD1101 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,143 | $0 | n/a |
UD1101 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $94 | $0 | n/a |
UD1101 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,619 | $1,015 | n/a |
UD1101 # 09 Y:2025 | 09 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $310 | $1,350 | n/a |
UD1101 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $430 | $1,040 | n/a |
UD1101 # 07 Y:2025 | 07 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,622 | $4,975 | n/a |
UD1101 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,266 | $952 | n/a |
UD1101 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,750 | $7,500 | n/a |
UD1101 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,284 | $0 | n/a |
UD1101 # 11 Y:2025 | 11 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,101 | $4,400 | n/a |
UC2314 # 13 Y:2023 | 13 | 2023 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $24,735 | $170,000 | Not Implemented |
UC2314 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,543 | $0 | Not Implemented |
UC2314 # 14 Y:2023 | 14 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,261 | $34,348 | Not Implemented |
UC2314 # 09 Y:2023 | 09 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $14,221 | $0 | Not Implemented |
UC2314 # 04 Y:2023 | 04 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,943 | $21,500 | Not Implemented |
UC2314 # 15 Y:2023 | 15 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,312 | $39,269 | Not Implemented |
UC2314 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,655 | $1,283 | Not Implemented |
UC2314 # 10 Y:2023 | 10 | 2023 | REPLACE BOILER | $8,265 | $39,281 | Not Implemented |
UC2314 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $197,753 | $1,537,591 | Not Implemented |
UC2314 # 02 Y:2023 | 02 | 2023 | PAY UTILITY BILLS ON TIME | $3,211 | $0 | Not Implemented |
UC2314 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,033 | $0 | Not Implemented |
UC2314 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $2,702 | $800 | Implemented |
UC2314 # 06 Y:2023 | 06 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $627 | $1,061 | Not Implemented |
UC2314 # 07 Y:2023 | 07 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,082 | $1,674 | Not Implemented |