IAC logo
IAC Assessment: UC2314
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2314
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2023
Principal Product Polycarbonate lenses
NAICS 339115 - Ophthalmic Goods Manufacturing
SIC 3851 - Ophthalmic Goods
Sales $50,000,000-$100,000,000
# of Employees 393
Plant Area (Sq.Ft.) 175,195
Annual Production 20,000,000 Units
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,398,500 17,384,400 kWh $0.14
Electricity Demand $443,110 29,196 kW-months/year $15.18
Electricity Fees $500,339 - $ -
Natural Gas $81,940 8,104 MMBtu $10.11
TOTAL ENERGY COSTS $3,423,889
RECOMMENDED SAVINGS* $319,309 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$5,543
Cost:
-
- - - - $5,543 - - - - - - - -
-
kWh
-
-
kW-months/year
$5,543
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$3,211
Cost:
-
- - - - $3,211 - - - - - - - -
-
kWh
-
-
kW-months/year
$3,211
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,655
Cost:
$1,283
$3,177 23,021 $479 32 - - - - - - - - $3,177
23,021
kWh
$479
32
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,943
Cost:
$21,500
$5,165 37,426 $778 51 - - - - - - - - $5,165
37,426
kWh
$778
51
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,702
Cost:
$800
$2,702 19,580 - - - - - - - - - - $2,702
19,580
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$627
Cost:
$1,061
- - - - - - $627 62 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$627
62
MMBtu
-
-
$
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,082
Cost:
$1,674
$1,029 7,456 $53 4 - - - - - - - - $1,029
7,456
kWh
$53
4
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,033
Cost:
-
- - - - - - $1,513 150 $(-480) - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,513
150
MMBtu
$(-480)
-
$
-
-
$
09: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$14,221
Cost:
-
$1,093 7,920 $4,008 264 $9,120 - - - - - - - $1,093
7,920
kWh
$4,008
264
kW-months/year
$9,120
-
$
-
-
MMBtu
-
-
$
-
-
$
10: 2.1224 REPLACE BOILER Savings:
$8,265
Cost:
$39,281
- - - - - - $8,265 818 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,265
818
MMBtu
-
-
$
-
-
$
11: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$197,753
Cost:
$1,537,591
$197,753 1,432,994 - - - - - - - - - - $197,753
1,432,994
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
12: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$26,966
Cost:
$395,108
$(-7,641) (-55,372) $36,432 2,400 - - - - - - $(-1,824) - $(-7,641)
(-55,372)
kWh
$36,432
2,400
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$(-1,824)
-
$
13: 2.3112 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS Savings:
$24,735
Cost:
$170,000
- - $24,735 1,629 - - - - - - - - -
-
kWh
$24,735
1,629
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
14: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$6,261
Cost:
$34,348
$2,949 21,368 $3,312 218 - - - - - - - - $2,949
21,368
kWh
$3,312
218
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
15: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$17,312
Cost:
$39,269
$15,044 109,087 $2,268 149 - - - - - - - - $15,044
109,087
kWh
$2,268
149
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$319,309
Cost:
$2,241,915
$221,270 1,603,479 $72,065 4,747 $17,874 - $10,405 1,029 $(-480) - $(-1,824) - $221,270
1,603,479
kWh
$72,065
4,747
kW-months/year
$17,874
-
$
$10,405
1,029
MMBtu
$(-480)
-
$
$(-1,824)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost