IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,372

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0649 # 06 Y:2024 06 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $570,483 $0 Not Implemented
SD0649 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,035 $39,675 Not Implemented
SD0649 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,802 $16,517 Implemented
SD0649 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $742,364 $1,089,169 Not Implemented
UU0237 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,040 $375 Not Implemented
UU0237 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $6,350 $8,970 Implemented
UU0237 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $7,109 $28,950 Implemented
UU0237 # 07 Y:2024 07 2024 PAY UTILITY BILLS ON TIME $210 $150 Implemented
UU0237 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,430 $3,000 Implemented
UU0237 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,340 $23,500 Implemented
UU0237 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $10,990 $184,280 Implemented
TT0299 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $221 $90 n/a
TT0299 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $9,312 $22,135 n/a
TT0299 # 07 Y:2023 07 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $387 $100 n/a
TT0299 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,097 $30 n/a
TT0299 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,491 $40 n/a
TT0299 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,478 $8,003 n/a
TT0299 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $632 $750 n/a
TT0299 # 05 Y:2023 05 2023 REDUCE HEAT GAIN BY WINDOW TINTING $809 $3,500 n/a
MA0859 # 06 Y:2023 06 2023 RECOVER WASTE HEAT FROM EQUIPMENT $28,671 $72,000 n/a
MA0859 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,456 $15,900 n/a
MA0859 # 01 Y:2023 01 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $1,034,369 $4,078,943 n/a
MA0859 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $20,649 $46,300 n/a
MA0859 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $11,753 $40,550 n/a
MA0859 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $166,304 $1,812,686 n/a