IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,372

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0036 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,127 $1,430 Not Implemented
DL0036 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,231 $0 Implemented
DL0036 # 06 Y:2009 06 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $596 $0 Implemented
DL0036 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $231 $594 Not Implemented
DL0036 # 08 Y:2009 08 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,742 $10,500 Not Implemented
LL0309 # 01 Y:2009 01 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,477 $1,200 Implemented
LL0309 # 02 Y:2009 02 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,468 $900 Not Implemented
LL0309 # 03 Y:2009 03 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,431 $600 Not Implemented
LL0309 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $707 $385 Implemented
LL0309 # 05 Y:2009 05 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $488 $462 Implemented
LL0309 # 06 Y:2009 06 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $318 $334 Not Implemented
LL0309 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $317 $300 Not Implemented
LE0285 # 01 Y:2009 01 2009 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $146,916 $900,000 Not Implemented
LE0285 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $12,507 $5,000 Not Implemented
LE0285 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,666 $200 Not Implemented
LE0285 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,646 $2,000 Not Implemented
LE0285 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,999 $12,000 Not Implemented
LE0285 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,792 $800 Not Implemented
LE0285 # 07 Y:2009 07 2009 INSTALL TIMERS AND/OR THERMOSTATS $1,391 $50 Implemented
LE0285 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $1,389 $1,525 Implemented
LE0285 # 09 Y:2009 09 2009 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $668 $900 Not Implemented
UM0349 # 01 Y:2009 01 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,327 $1,000 Implemented
UM0349 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $5,172 $1,840 Implemented
UM0349 # 03 Y:2009 03 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,531 $3,168 Implemented
UM0349 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $479 $100 Implemented