IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,372

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0258 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $491 $469 Implemented
SU0258 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,446 $4,400 Implemented
SU0258 # 11 Y:2007 11 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,915 $2,847 Not Implemented
SU0258 # 12 Y:2007 12 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $197 $344 Not Implemented
SU0258 # 13 Y:2007 13 2007 INSTALL OCCUPANCY SENSORS $112 $357 Implemented
SU0258 # 14 Y:2007 14 2007 OPTIMIZE PLANT POWER FACTOR $1,080 $9,965 Not Implemented
UA0006 # 01 Y:2007 01 2007 USE PHOTOCELL CONTROLS $112 $36 Not Implemented
UA0006 # 02 Y:2007 02 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,561 $1,023 Not Implemented
UA0006 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $40 $10 Not Implemented
UA0006 # 04 Y:2007 04 2007 DISCONNECT BALLASTS $497 $216 Implemented
UA0006 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $358 $276 Implemented
UA0006 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $120 $0 Implemented
WV0360 # 01 Y:2007 01 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $48,535 $170,000 Not Implemented
WV0360 # 02 Y:2007 02 2007 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $44,169 $15,000 Not Implemented
WV0360 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,939 $70,000 Not Implemented
WV0360 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,938 $700 Implemented
WV0360 # 05 Y:2007 05 2007 DEVELOP A REPAIR/REPLACE POLICY $5,516 $1,900 Implemented
WV0360 # 06 Y:2007 06 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,399 $1,000 Implemented
WV0360 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,158 $400 Not Implemented
WV0360 # 08 Y:2007 08 2007 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,676 $3,700 Implemented
WV0360 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,188 $25 Implemented
WV0360 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,930 $300 Implemented
WV0360 # 11 Y:2007 11 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,426 $900 Implemented
SU0248 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,292 $0 Not Implemented
SU0248 # 02 Y:2007 02 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,903 $0 Not Implemented