Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,372
matching recommendationsNAICS | 3399 | Other Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0708 # 12 Y:2004 | 12 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,677 | $5,152 | Not Implemented |
UD0708 # 13 Y:2004 | 13 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,344 | $0 | Not Implemented |
UD0708 # 14 Y:2004 | 14 | 2004 | INSULATE BARE EQUIPMENT | $2,927 | $986 | Not Implemented |
UU0070 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,370,474 | $22,000,000 | Not Implemented |
UU0070 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $95,199 | $0 | Implemented |
UU0070 # 03 Y:2004 | 03 | 2004 | OPTIMIZE PLANT POWER FACTOR | $16,729 | $26,520 | Not Implemented |
UU0070 # 04 Y:2004 | 04 | 2004 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $73,401 | $750,000 | Implemented |
UU0070 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $70,000 | $18,000 | Implemented |
IA0354 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $530 | $60 | Not Implemented |
IA0354 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,722 | $207 | Implemented |
IA0354 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $561 | $238 | Implemented |
IA0354 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $389 | $710 | Implemented |
IA0354 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $973 | $1,626 | Implemented |
IA0354 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $885 | $2,484 | Implemented |
UM0267 # 01 Y:2004 | 01 | 2004 | RECOVER AND REUSE WASTE MATERIAL | $27,320 | $10,000 | Not Implemented |
UM0267 # 02 Y:2004 | 02 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $15,684 | $2,400 | Not Implemented |
UM0267 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,675 | $20,137 | Implemented |
UM0267 # 04 Y:2004 | 04 | 2004 | OPTIMIZE PLANT POWER FACTOR | $11,902 | $21,150 | Implemented |
UM0267 # 05 Y:2004 | 05 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,938 | $2,615 | Implemented |
UM0267 # 06 Y:2004 | 06 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,119 | $1,300 | Not Implemented |
UM0267 # 07 Y:2004 | 07 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,390 | $200 | Not Implemented |
UM0267 # 08 Y:2004 | 08 | 2004 | USE OPTIMUM THICKNESS INSULATION | $3,274 | $1,985 | Not Implemented |
UM0267 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $711 | $736 | Not Implemented |
SU0193 # 01 Y:2004 | 01 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,858 | $0 | Implemented |
SU0193 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,779 | $0 | Implemented |