Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
134
matching recommendationsNAICS | 3399 | Other Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1213 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $460 | $756 | Not Implemented |
UK1213 # 01 Y:2012 | 01 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $16,324 | $0 | Implemented |
UK1213 # 02 Y:2012 | 02 | 2012 | OPTIMIZE PLANT POWER FACTOR | $14,754 | $11,220 | Not Implemented |
UK1213 # 11 Y:2012 | 11 | 2012 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,482 | $988 | Not Implemented |
UK1213 # 07 Y:2012 | 07 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $343 | $269 | Implemented |
UK1213 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,410 | $26,824 | Implemented |
UK1213 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $350 | $500 | Not Implemented |
UK1213 # 08 Y:2012 | 08 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $654 | $337 | Implemented |
UK1213 # 10 Y:2012 | 10 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $49,180 | $6,650 | Not Implemented |
UK1213 # 04 Y:2012 | 04 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $4,375 | $10,500 | Not Implemented |
UK1213 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $316 | $327 | Not Implemented |
UK1213 # 12 Y:2012 | 12 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,563 | $4,550 | Implemented |
BS0006 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $698 | $90 | Implemented |
BS0006 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $154 | $290 | Not Implemented |
BS0006 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,588 | $11,386 | Not Implemented |
BS0006 # 01 Y:2012 | 01 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $3,105 | $10,500 | Not Implemented |
MAS027 # 03 Y:2012 | 03 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,336 | $500 | Not Implemented |
MAS027 # 01 Y:2012 | 01 | 2012 | REDUCE VENTILATION AIR | $23,907 | $33,500 | Not Implemented |
MAS027 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,449 | $28,000 | Not Implemented |
WM0009 # 01 Y:2012 | 01 | 2012 | INSTALL OCCUPANCY SENSORS | $1,062 | $660 | Not Implemented |
WM0009 # 02 Y:2012 | 02 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $167 | $60 | Not Implemented |
WM0009 # 03 Y:2012 | 03 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $3,162 | $2,448 | Implemented |
WM0009 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $259 | $200 | Implemented |
WM0009 # 05 Y:2012 | 05 | 2012 | CHANGE PRODUCT SPECS | $11,780 | $0 | Not Implemented |
WM0009 # 06 Y:2012 | 06 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $12,250 | $19,000 | Not Implemented |