IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 339910 Jewelry and Silverware Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0396 # 12 Y:2015 12 2015 ADD AREA LIGHTING SWITCHES $781 $3,851 Not Implemented
SU0396 # 11 Y:2015 11 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $112 $462 Not Implemented
SU0396 # 10 Y:2015 10 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $419 $0 Implemented
SU0396 # 09 Y:2015 09 2015 ELIMINATE/REDUCE AN OPERATION $1,222 $2,440 Not Implemented
SU0396 # 08 Y:2015 08 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,009 $17,408 Implemented
SU0396 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $1,250 Not Implemented
SU0396 # 06 Y:2015 06 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,027 $20,360 Implemented
SU0396 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,889 $930 Implemented
SU0396 # 04 Y:2015 04 2015 CHECK FOR ACCURACY OF UTILITY / POWER METERS $243 $0 Implemented
SU0396 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $486 $0 Not Implemented
SU0396 # 02 Y:2015 02 2015 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $738 $0 Implemented
SU0396 # 01 Y:2015 01 2015 PAY BILLS ON TIME TO AVOID LATE FEES $813 $0 Implemented
BD0456 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,269 $19,500 Not Implemented
BD0456 # 01 Y:2015 01 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,758 $5,000 Not Implemented
BD0456 # 11 Y:2015 11 2015 INSTALL OCCUPANCY SENSORS $374 $750 Not Implemented
BD0456 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $606 $400 Implemented
BD0456 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,006 $548 Implemented
BD0456 # 08 Y:2015 08 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $678 $210 Not Implemented
BD0456 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $1,500 Implemented
BD0456 # 06 Y:2015 06 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $843 $920 Not Implemented
BD0456 # 05 Y:2015 05 2015 USE POWER DURING OFF-PEAK PERIODS $1,111 $17 Not Implemented
BD0456 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,225 $1,219 Not Implemented
BD0456 # 03 Y:2015 03 2015 USE POWER DURING OFF-PEAK PERIODS $5,111 $17 Not Implemented
LL0309 # 02 Y:2009 02 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,468 $900 Not Implemented
LL0309 # 07 Y:2009 07 2009 INSTALL OCCUPANCY SENSORS $317 $300 Not Implemented