Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2015 |
Principal Product | Flatware |
NAICS | 339910 - Jewelry and Silverware Manufacturing |
SIC | 3914 - Silverware And Plated Ware |
Sales | $1,000,000-$5,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 240,000 |
Annual Production | 250,000 Pounds |
Production Hrs. Annual | 2,184 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $125,510 | 3,159,730 | kWh | $0.04 |
Electricity Demand | $47,222 | 10,892 | kW-months/year | $4.34 |
Natural Gas | $29,738 | 5,003 | MMBtu | $5.94 |
TOTAL ENERGY COSTS | $207,754 | |||
RECOMMENDED SAVINGS* | $43,283 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $39,138 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $813 Cost: - |
- | - | - | - | - | - | - | - | $813 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$813 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS |
Savings: $738 Cost: - |
$738 | 18,590 | - | - | - | - | - | - | - | - |
$738 18,590 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $486 Cost: - |
$315 | 7,925 | $171 | 40 | - | - | - | - | - | - |
$315 7,925 kWh |
$171 40 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS |
Savings: $243 Cost: - |
- | - | - | - | - | - | - | - | $243 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$243 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,889 Cost: $930 |
$181 | 4,555 | $27 | 6 | - | - | $1,050 | - | $631 | - |
$181 4,555 kWh |
$27 6 kW-months/year |
- - MMBtu |
$1,050 - $ |
$631 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $17,027 Cost: $20,360 |
$14,673 | 369,600 | $4,330 | 1,000 | $(-1,976) | (-333) | - | - | - | - |
$14,673 369,600 kWh |
$4,330 1,000 kW-months/year |
$(-1,976) (-333) MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,544 Cost: $1,250 |
$1,009 | 25,428 | $535 | 124 | - | - | - | - | - | - |
$1,009 25,428 kWh |
$535 124 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $18,009 Cost: $17,408 |
- | - | - | - | $18,009 | 3,032 | - | - | - | - |
- - kWh |
- - kW-months/year |
$18,009 3,032 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $1,222 Cost: $2,440 |
$(-6) | (-149) | $(-145) | (-34) | - | - | $450 | - | $923 | - |
$(-6) (-149) kWh |
$(-145) (-34) kW-months/year |
- - MMBtu |
$450 - $ |
$923 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $419 Cost: - |
$274 | 6,906 | $145 | 34 | - | - | - | - | - | - |
$274 6,906 kWh |
$145 34 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $112 Cost: $462 |
$112 | 2,828 | - | - | - | - | - | - | - | - |
$112 2,828 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7131 ADD AREA LIGHTING SWITCHES |
Savings: $781 Cost: $3,851 |
$355 | 8,954 | $426 | 98 | - | - | - | - | - | - |
$355 8,954 kWh |
$426 98 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $43,283 Cost: $46,701 |
$17,651 | 444,637 | $5,489 | 1,268 | $16,033 | 2,699 | $1,500 | - | $2,610 | - | $17,651 444,637 kWh |
$5,489 1,268 kW-months/year |
$16,033 2,699 MMBtu |
$1,500 - $ |
$2,610 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $39,138 Cost: $38,698 |
$15,866 | 399,651 | $4,502 | 1,040 | $16,033 | 2,699 | $1,050 | - | $1,687 | - | $15,866 399,651 kWh |
$4,502 1,040 kW-months/year |
$16,033 2,699 MMBtu |
$1,050 - $ |
$1,687 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost |