Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsNAICS | 339910 | Jewelry and Silverware Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0396 # 01 Y:2015 | 01 | 2015 | PAY BILLS ON TIME TO AVOID LATE FEES | $813 | $0 | Implemented |
SU0396 # 12 Y:2015 | 12 | 2015 | ADD AREA LIGHTING SWITCHES | $781 | $3,851 | Not Implemented |
SU0396 # 11 Y:2015 | 11 | 2015 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $112 | $462 | Not Implemented |
SU0396 # 10 Y:2015 | 10 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $419 | $0 | Implemented |
SU0396 # 09 Y:2015 | 09 | 2015 | ELIMINATE/REDUCE AN OPERATION | $1,222 | $2,440 | Not Implemented |
SU0396 # 08 Y:2015 | 08 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $18,009 | $17,408 | Implemented |
SU0396 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,544 | $1,250 | Not Implemented |
SU0396 # 06 Y:2015 | 06 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,027 | $20,360 | Implemented |
SU0396 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,889 | $930 | Implemented |
SU0396 # 04 Y:2015 | 04 | 2015 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $243 | $0 | Implemented |
SU0396 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $486 | $0 | Not Implemented |
SU0396 # 02 Y:2015 | 02 | 2015 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $738 | $0 | Implemented |
BD0456 # 01 Y:2015 | 01 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,758 | $5,000 | Not Implemented |
BD0456 # 11 Y:2015 | 11 | 2015 | INSTALL OCCUPANCY SENSORS | $374 | $750 | Not Implemented |
BD0456 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $606 | $400 | Implemented |
BD0456 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,006 | $548 | Implemented |
BD0456 # 08 Y:2015 | 08 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $678 | $210 | Not Implemented |
BD0456 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $685 | $1,500 | Implemented |
BD0456 # 06 Y:2015 | 06 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $843 | $920 | Not Implemented |
BD0456 # 05 Y:2015 | 05 | 2015 | USE POWER DURING OFF-PEAK PERIODS | $1,111 | $17 | Not Implemented |
BD0456 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,225 | $1,219 | Not Implemented |
BD0456 # 03 Y:2015 | 03 | 2015 | USE POWER DURING OFF-PEAK PERIODS | $5,111 | $17 | Not Implemented |
BD0456 # 02 Y:2015 | 02 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $22,269 | $19,500 | Not Implemented |