IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
NAICS 33995 Sign Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0268 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $70,433 $80 Not Implemented
MI0268 # 03 Y:2014 03 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $58,931 $93,833 Not Implemented
MI0268 # 04 Y:2014 04 2014 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $47,940 $1,400 Not Implemented
MI0268 # 05 Y:2014 05 2014 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $33,525 $8,960 Not Implemented
MI0268 # 06 Y:2014 06 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $33,490 $80 Not Implemented
MI0268 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,776 $62,320 Not Implemented
MI0268 # 08 Y:2014 08 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,155 $33,600 Not Implemented
MI0268 # 09 Y:2014 09 2014 ISOLATE HOT OR COLD EQUIPMENT $22,002 $26,830 Not Implemented
MI0268 # 10 Y:2014 10 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $18,560 $640 Not Implemented
MI0268 # 11 Y:2014 11 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,297 $1,660 Not Implemented
MI0268 # 12 Y:2014 12 2014 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $7,749 $800 Not Implemented
MI0268 # 13 Y:2014 13 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,686 $3,200 Not Implemented
MI0268 # 14 Y:2014 14 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,659 $9,784 Not Implemented
MI0268 # 15 Y:2014 15 2014 AIR CONDITION ONLY SPACE NECESSARY $5,676 $20,960 Not Implemented
MI0268 # 16 Y:2014 16 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,110 $4,800 Not Implemented
MI0268 # 17 Y:2014 17 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,625 $80 Not Implemented
SU0363 # 01 Y:2014 01 2014 INSTALL TIMERS AND/OR THERMOSTATS $8,835 $0 Implemented
SU0363 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,805 $0 Implemented
SU0363 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $419 $40 Implemented
SU0363 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $942 $156 Implemented
SU0363 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $245 $101 Implemented
SU0363 # 06 Y:2014 06 2014 ELIMINATE/REDUCE AN OPERATION $2,875 $3,456 Implemented
SU0363 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $293 $732 Implemented
SU0363 # 08 Y:2014 08 2014 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $263 $810 Implemented
SU0363 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $682 $3,264 Implemented