IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
NAICS 339950 Sign Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL1808 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $310 $0 Not Implemented
CL1808 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,135 $2,080 Not Implemented
CL1808 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,697 $3,911 Not Implemented
CL1808 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,900 $250 Not Implemented
IP0049 # 11 Y:2015 11 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,976 $21,474 Implemented
IP0049 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,197 $8 Implemented
IP0049 # 10 Y:2015 10 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $5,682 $15,286 Not Implemented
IP0049 # 09 Y:2015 09 2015 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $4,057 $6,011 Not Implemented
IP0049 # 08 Y:2015 08 2015 APPLY FOR INVESTMENT INCENTIVES $7,789 $10,000 Not Implemented
IP0049 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $223 $283 Not Implemented
IP0049 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,511 $4,400 Not Implemented
IP0049 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $1,359 $770 Not Implemented
IP0049 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,009 $70 Implemented
IP0049 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,918 $400 Not Implemented
IP0049 # 01 Y:2015 01 2015 PAY BILLS ON TIME TO AVOID LATE FEES $4,118 $0 Implemented
WM0074 # 02 Y:2015 02 2015 CONDENSE OPERATION INTO ONE BUILDING $2,174 $0 Implemented
WM0074 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,192 $0 Not Implemented
WM0074 # 03 Y:2015 03 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,126 $860 Not Implemented
WM0074 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,738 $15,750 Not Implemented
WM0074 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $19,530 $50,000 Not Implemented
WM0074 # 09 Y:2015 09 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,625 $1,774 Implemented
WM0074 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,763 $305 Not Implemented
WM0074 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,746 $6,310 Not Implemented
WM0074 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $784 $225 Implemented
MI0268 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $70,433 $80 Not Implemented