IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
NAICS 339950 Sign Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0498 # 05 Y:2013 05 2013 OPTIMIZE PLANT POWER FACTOR $6,316 $3,693 Not Implemented
IA0498 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $5,092 $3,443 Not Implemented
IA0498 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $753 $660 Implemented
IA0498 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $901 $525 Implemented
IA0498 # 01 Y:2013 01 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,917 $9,898 Not Implemented
WM0009 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $3,162 $2,448 Implemented
WM0009 # 02 Y:2012 02 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $167 $60 Not Implemented
WM0009 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,062 $660 Not Implemented
WM0009 # 06 Y:2012 06 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $12,250 $19,000 Not Implemented
WM0009 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $259 $200 Implemented
WM0009 # 05 Y:2012 05 2012 CHANGE PRODUCT SPECS $11,780 $0 Not Implemented
MI0201 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $36,428 $124,975 Not Implemented
MI0201 # 02 Y:2011 02 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,894 $2,000 Implemented
MI0201 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $18,870 $7,920 Implemented
MI0201 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,894 $2,200 Implemented
MI0201 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,184 $41,193 Not Implemented
MI0201 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,700 $1,210 Not Implemented
MI0201 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,900 $40 Implemented
MI0201 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,322 $1,275 Not Implemented
UA0055 # 03 Y:2010 03 2010 USE MINIMUM SAFE OVEN VENTILATION $4,422 $990 Not Implemented
UA0055 # 05 Y:2010 05 2010 USE RADIANT HEATER FOR SPOT HEATING $3,444 $1,970 Not Implemented
UA0055 # 02 Y:2010 02 2010 USE OPTIMUM THICKNESS INSULATION $12,398 $1,602 Not Implemented
UA0055 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $14,550 $5,020 Not Implemented
UA0055 # 12 Y:2010 12 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $114 $250 Not Implemented
UA0055 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $559 $387 Not Implemented