IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
NAICS 4231 Motor Vehicle and Motor Vehicle Parts and Supplies Merchant Wholesalers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0025 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,914 $5,609 n/a
NT0025 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,511 $906 n/a
NT0025 # 04 Y:2024 04 2024 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $36,410 $21,995 n/a
NT0025 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $2,643 $1,302 n/a
NT0025 # 06 Y:2024 06 2024 CHANGE OPERATING CONDITIONS $150,000 $1,200,000 n/a
NT0025 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,136 $0 n/a
LE0340 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,181 $8,250 Not Implemented
LE0340 # 09 Y:2012 09 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,535 $21,000 Not Implemented
LE0340 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,096 $12,800 Not Implemented
LE0340 # 11 Y:2012 11 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $586 $800 Not Implemented
LE0340 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,208 $54,225 Not Implemented
LE0340 # 05 Y:2012 05 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,033 $5,527 Not Implemented
LE0340 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $1,900 Not Implemented
LE0340 # 08 Y:2012 08 2012 INSTALL TIMERS AND/OR THERMOSTATS $16,632 $3,000 Not Implemented
LE0340 # 06 Y:2012 06 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,053 $13,598 Not Implemented
LE0340 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $953 $1,000 Not Implemented
LE0340 # 04 Y:2012 04 2012 INSTALL TIMERS AND/OR THERMOSTATS $26,676 $0 Not Implemented
LE0340 # 14 Y:2012 14 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $262 $520 Not Implemented
LE0340 # 12 Y:2012 12 2012 INSTALL OCCUPANCY SENSORS $16,429 $30,000 Not Implemented
LE0340 # 15 Y:2012 15 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,205 $10,010 Not Implemented
LE0340 # 13 Y:2012 13 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,090 $0 Not Implemented
OK0818 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $482 $2,104 Implemented
OK0818 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $535 $386 Not Implemented
OK0818 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,355 $4,015 Not Implemented
OK0818 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,726 $1,635 Implemented