Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 4234 | Professional and Commercial Equipment and Supplies Merchant Wholesalers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1077 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,384 | $78,400 | Not Implemented |
UD1077 # 03 Y:2024 | 03 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $145 | $550 | Not Implemented |
UD1077 # 02 Y:2024 | 02 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,002 | $25,200 | Not Implemented |
UD1077 # 01 Y:2024 | 01 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $1,038 | $5,500 | Not Implemented |
DL0097 # 02 Y:2012 | 02 | 2012 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $3,650 | $2,490 | Not Implemented |
DL0097 # 09 Y:2012 | 09 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $590 | $100 | Not Implemented |
DL0097 # 08 Y:2012 | 08 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $570 | $100 | Not Implemented |
DL0097 # 06 Y:2012 | 06 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,800 | $500 | Not Implemented |
DL0097 # 05 Y:2012 | 05 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,780 | $500 | Implemented |
DL0097 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,670 | $40,320 | Not Implemented |
DL0097 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,900 | $100 | Implemented |
DL0097 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,670 | $100 | Not Implemented |
DL0097 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,570 | $2,500 | Implemented |
SD0501 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,905 | $13,511 | Not Implemented |
SD0501 # 03 Y:2010 | 03 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,800 | $2,000 | Not Implemented |
SD0501 # 02 Y:2010 | 02 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,118 | $9,600 | Not Implemented |
SD0501 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,991 | $20,850 | Not Implemented |
IC0167 # 05 Y:2009 | 05 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,524 | $1,260 | Implemented |
IC0167 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $137 | $115 | Implemented |
IC0167 # 07 Y:2009 | 07 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $3,067 | $8,134 | Implemented |
IC0167 # 08 Y:2009 | 08 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $452 | $0 | Not Implemented |
IC0167 # 04 Y:2009 | 04 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $875 | $400 | Implemented |
IC0167 # 03 Y:2009 | 03 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,193 | $0 | Implemented |
IC0167 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,522 | $458 | Implemented |
IC0167 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,950 | $19,296 | Not Implemented |