Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 42383 | Industrial Machinery and Equipment Merchant Wholesalers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0552 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $790 | $570 | Implemented |
LE0552 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $608 | $100 | Implemented |
LE0552 # 10 Y:2023 | 10 | 2023 | USE SOLAR HEAT TO HEAT WATER | $20,496 | $210,000 | Not Implemented |
LE0552 # 09 Y:2023 | 09 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,062 | $48,000 | Implemented |
LE0552 # 08 Y:2023 | 08 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,547 | $10,241 | Not Implemented |
LE0552 # 07 Y:2023 | 07 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $448 | $2,100 | Not Implemented |
LE0552 # 06 Y:2023 | 06 | 2023 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $12,123 | $35,000 | Not Implemented |
LE0552 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,342 | $5,052 | Not Implemented |
LE0552 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $231 | $320 | Implemented |
LE0552 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,712 | $2,500 | Implemented |
UD0818 # 16 Y:2010 | 16 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,929 | $0 | Implemented |
UD0818 # 15 Y:2010 | 15 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,060 | $0 | Implemented |
UD0818 # 14 Y:2010 | 14 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $29,159 | $0 | Not Implemented |
UD0818 # 13 Y:2010 | 13 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,977 | $0 | Not Implemented |
UD0818 # 12 Y:2010 | 12 | 2010 | USE OPTIMUM TEMPERATURE | $3,887 | $0 | Not Implemented |
UD0818 # 11 Y:2010 | 11 | 2010 | INSTALL AUTOMATIC STACK DAMPER | $4,241 | $0 | Not Implemented |
UD0818 # 10 Y:2010 | 10 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,820 | $0 | Not Implemented |
UD0818 # 09 Y:2010 | 09 | 2010 | USE OPTIMUM TEMPERATURE | $7,200 | $0 | Implemented |
UD0818 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $16,190 | $0 | Not Implemented |
UD0818 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $875 | $0 | Not Implemented |
UD0818 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,158 | $0 | Implemented |
UD0818 # 05 Y:2010 | 05 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,405 | $0 | Not Implemented |
UD0818 # 04 Y:2010 | 04 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $5,865 | $0 | Implemented |
UD0818 # 03 Y:2010 | 03 | 2010 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $103,369 | $0 | Implemented |
UD0818 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,791 | $1,460 | Not Implemented |