Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2010 |
Principal Product | Industrial and IT Enclosures |
NAICS | 423830 - Industrial Machinery and Equipment Merchant Wholesalers |
SIC | 5084 - Industrial Machinery And Equipment |
Sales | $100,000,000-$500,000,000 |
# of Employees | 550 |
Plant Area (Sq.Ft.) | 512,000 |
Annual Production | 123,000 Pieces |
Production Hrs. Annual | 6,912 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $945,594 | 14,751,073 | kWh | $0.06 |
Natural Gas | $558,796 | 50,114 | MMBtu | $11.15 |
TOTAL ENERGY COSTS | $1,504,390 | |||
RECOMMENDED SAVINGS* | $213,802 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $146,457 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,876 Cost: - |
$9,435 | 246,476 | $7,262 | 36 | - | - | $1,179 | - | - | - |
$9,435 246,476 kWh |
$7,262 36 kW-months/year |
- - MMBtu |
$1,179 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,791 Cost: $1,460 |
$1,195 | 31,439 | $702 | 4 | - | - | $894 | - | - | - |
$1,195 31,439 kWh |
$702 4 kW-months/year |
- - MMBtu |
$894 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $103,369 Cost: - |
$47,979 | 1,253,376 | $55,390 | 272 | - | - | - | - | - | - |
$47,979 1,253,376 kWh |
$55,390 272 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $5,865 Cost: - |
$2,566 | 64,800 | $3,299 | 16 | - | - | - | - | - | - |
$2,566 64,800 kWh |
$3,299 16 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,405 Cost: - |
$794 | 20,736 | $611 | 3 | - | - | - | - | - | - |
$794 20,736 kWh |
$611 3 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,158 Cost: - |
$2,766 | 72,796 | $1,692 | 8 | - | - | $(-1,300) | - | - | - |
$2,766 72,796 kWh |
$1,692 8 kW-months/year |
- - MMBtu |
$(-1,300) - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $875 Cost: - |
$543 | 14,279 | $332 | 2 | - | - | - | - | - | - |
$543 14,279 kWh |
$332 2 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $16,190 Cost: - |
- | - | - | - | $16,190 | 1,452 | - | - | - | - |
- - kWh |
- - kW-months/year |
$16,190 1,452 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2211 USE OPTIMUM TEMPERATURE |
Savings: $7,200 Cost: - |
- | - | - | - | $7,200 | 646 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,200 646 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $5,820 Cost: - |
- | - | - | - | $4,906 | 440 | - | - | $914 | - |
- - kWh |
- - kW-months/year |
$4,906 440 MMBtu |
- - $ |
$914 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $4,241 Cost: - |
- | - | - | - | $4,241 | 380 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,241 380 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.2211 USE OPTIMUM TEMPERATURE |
Savings: $3,887 Cost: - |
- | - | - | - | $3,887 | 349 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,887 349 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,977 Cost: - |
- | - | - | - | $2,977 | 267 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,977 267 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $29,159 Cost: - |
$21,760 | 572,636 | $7,399 | 109 | - | - | - | - | - | - |
$21,760 572,636 kWh |
$7,399 109 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $1,060 Cost: - |
$490 | 12,902 | $570 | 3 | - | - | - | - | - | - |
$490 12,902 kWh |
$570 3 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $7,929 Cost: - |
- | - | - | - | $7,929 | 711 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,929 711 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $213,802 Cost: $1,460 |
$87,528 | 2,289,440 | $77,257 | 453 | $47,330 | 4,245 | $773 | - | $914 | - | $87,528 2,289,440 kWh |
$77,257 453 kW-months/year |
$47,330 4,245 MMBtu |
$773 - $ |
$914 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $146,457 Cost: - |
$63,236 | 1,650,350 | $68,213 | 335 | $15,129 | 1,357 | $(-121) | - | - | - | $63,236 1,650,350 kWh |
$68,213 335 kW-months/year |
$15,129 1,357 MMBtu |
$(-121) - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Water Consumption |