IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 423830 Industrial Machinery and Equipment Merchant Wholesalers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0552 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $790 $570 Implemented
LE0552 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $608 $100 Implemented
LE0552 # 10 Y:2023 10 2023 USE SOLAR HEAT TO HEAT WATER $20,496 $210,000 Not Implemented
LE0552 # 09 Y:2023 09 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,062 $48,000 Implemented
LE0552 # 08 Y:2023 08 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,547 $10,241 Not Implemented
LE0552 # 07 Y:2023 07 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $448 $2,100 Not Implemented
LE0552 # 06 Y:2023 06 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $12,123 $35,000 Not Implemented
LE0552 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,342 $5,052 Not Implemented
LE0552 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $231 $320 Implemented
LE0552 # 03 Y:2023 03 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,712 $2,500 Implemented
UD0818 # 16 Y:2010 16 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,929 $0 Implemented
UD0818 # 15 Y:2010 15 2010 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,060 $0 Implemented
UD0818 # 14 Y:2010 14 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $29,159 $0 Not Implemented
UD0818 # 13 Y:2010 13 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,977 $0 Not Implemented
UD0818 # 12 Y:2010 12 2010 USE OPTIMUM TEMPERATURE $3,887 $0 Not Implemented
UD0818 # 11 Y:2010 11 2010 INSTALL AUTOMATIC STACK DAMPER $4,241 $0 Not Implemented
UD0818 # 10 Y:2010 10 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,820 $0 Not Implemented
UD0818 # 09 Y:2010 09 2010 USE OPTIMUM TEMPERATURE $7,200 $0 Implemented
UD0818 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $16,190 $0 Not Implemented
UD0818 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $875 $0 Not Implemented
UD0818 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,158 $0 Implemented
UD0818 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,405 $0 Not Implemented
UD0818 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $5,865 $0 Implemented
UD0818 # 03 Y:2010 03 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $103,369 $0 Implemented
UD0818 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,791 $1,460 Not Implemented