Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsNAICS | 42393 | Recyclable Material Merchant Wholesalers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0181 # 04 Y:2023 | 04 | 2023 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $1,031 | $6,735 | Not Implemented |
IP0181 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $136 | $95 | Not Implemented |
IP0181 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,823 | $239 | Not Implemented |
IP0181 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $465 | $18 | Not Implemented |
TR0032 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $291,171 | $4,331,813 | Not Implemented |
TR0032 # 02 Y:2022 | 02 | 2022 | OPTIMIZE PLANT POWER FACTOR | $6,520 | $17,100 | Not Implemented |
TR0032 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,606 | $6,302 | Not Implemented |
IC0248 # 02 Y:2021 | 02 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $23,744 | $0 | Implemented |
IC0248 # 07 Y:2021 | 07 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,758 | $258 | Not Implemented |
IC0248 # 06 Y:2021 | 06 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,328 | $349 | Not Implemented |
IC0248 # 05 Y:2021 | 05 | 2021 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,297 | $0 | Implemented |
IC0248 # 04 Y:2021 | 04 | 2021 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $724 | $712 | Implemented |
IC0248 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $94,808 | $23,408 | Not Implemented |
IC0248 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,148 | $4,150 | Not Implemented |
UM0377 # 01 Y:2010 | 01 | 2010 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,826 | $600,000 | Not Implemented |
UM0377 # 02 Y:2010 | 02 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $4,594 | $7,127 | Not Implemented |
UM0377 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $421 | $200 | Not Implemented |
UM0377 # 04 Y:2010 | 04 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $71 | $10 | Not Implemented |
UM0377 # 05 Y:2010 | 05 | 2010 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $47,701 | $4,568 | Not Implemented |
UM0377 # 06 Y:2010 | 06 | 2010 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $11,037 | $8,500 | Not Implemented |
UM0377 # 07 Y:2010 | 07 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,767 | $700 | Not Implemented |
UM0377 # 08 Y:2010 | 08 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,554 | $11,607 | Not Implemented |
UM0377 # 09 Y:2010 | 09 | 2010 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $626 | $627 | Not Implemented |