Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 424 | Merchant Wholesalers, Nondurable Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0431 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $373 | $100 | Implemented |
BD0431 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $483 | $295 | Implemented |
BD0431 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $587 | $2,261 | Implemented |
BD0431 # 03 Y:2013 | 03 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $647 | $220 | Implemented |
BD0431 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $761 | $2,800 | Implemented |
BD0431 # 01 Y:2013 | 01 | 2013 | USE PHOTOCELL CONTROLS | $1,658 | $1,770 | Not Implemented |
BD0431 # 07 Y:2013 | 07 | 2013 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $12,000 | $1,000 | Implemented |
SD0469 # 02 Y:2013 | 02 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $23,156 | $8,740 | Not Implemented |
SD0469 # 01 Y:2013 | 01 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $37,421 | $53,250 | Implemented |
SD0469 # 03 Y:2013 | 03 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,384 | $50,200 | Not Implemented |
SD0469 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,246 | $10,350 | Not Implemented |
SD0469 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,014 | $15,500 | Not Implemented |
SD0469 # 06 Y:2013 | 06 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,769 | $7,320 | Not Implemented |
SD0469 # 07 Y:2013 | 07 | 2013 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,825 | $1,500 | Not Implemented |
SD0469 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,817 | $600 | Not Implemented |
SD0469 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,250 | $200 | Implemented |
DL0105 # 09 Y:2013 | 09 | 2013 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,350 | $3,200 | Not Implemented |
DL0105 # 10 Y:2013 | 10 | 2013 | USE RADIANT HEATER FOR SPOT HEATING | $154,000 | $1,000,000 | Implemented |
DL0105 # 08 Y:2013 | 08 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,000 | $80 | Implemented |
DL0105 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,200 | $2,300 | Not Implemented |
DL0105 # 06 Y:2013 | 06 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,400 | $590 | Not Implemented |
DL0105 # 05 Y:2013 | 05 | 2013 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $16,300 | $500 | Not Implemented |
DL0105 # 04 Y:2013 | 04 | 2013 | ADD AREA LIGHTING SWITCHES | $18,950 | $1,400 | Implemented |
DL0105 # 03 Y:2013 | 03 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $20,300 | $8,000 | Not Implemented |
DL0105 # 02 Y:2013 | 02 | 2013 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $54,800 | $200 | Not Implemented |