IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 424 Merchant Wholesalers, Nondurable Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0431 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $373 $100 Implemented
BD0431 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $483 $295 Implemented
BD0431 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $587 $2,261 Implemented
BD0431 # 03 Y:2013 03 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $647 $220 Implemented
BD0431 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $761 $2,800 Implemented
BD0431 # 01 Y:2013 01 2013 USE PHOTOCELL CONTROLS $1,658 $1,770 Not Implemented
BD0431 # 07 Y:2013 07 2013 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $12,000 $1,000 Implemented
SD0469 # 02 Y:2013 02 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $23,156 $8,740 Not Implemented
SD0469 # 01 Y:2013 01 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $37,421 $53,250 Implemented
SD0469 # 03 Y:2013 03 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,384 $50,200 Not Implemented
SD0469 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,246 $10,350 Not Implemented
SD0469 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,014 $15,500 Not Implemented
SD0469 # 06 Y:2013 06 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,769 $7,320 Not Implemented
SD0469 # 07 Y:2013 07 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,825 $1,500 Not Implemented
SD0469 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,817 $600 Not Implemented
SD0469 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,250 $200 Implemented
DL0105 # 09 Y:2013 09 2013 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,350 $3,200 Not Implemented
DL0105 # 10 Y:2013 10 2013 USE RADIANT HEATER FOR SPOT HEATING $154,000 $1,000,000 Implemented
DL0105 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,000 $80 Implemented
DL0105 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,200 $2,300 Not Implemented
DL0105 # 06 Y:2013 06 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,400 $590 Not Implemented
DL0105 # 05 Y:2013 05 2013 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $16,300 $500 Not Implemented
DL0105 # 04 Y:2013 04 2013 ADD AREA LIGHTING SWITCHES $18,950 $1,400 Implemented
DL0105 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $20,300 $8,000 Not Implemented
DL0105 # 02 Y:2013 02 2013 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $54,800 $200 Not Implemented