Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsNAICS | 4244 | Grocery and Related Product Merchant Wholesalers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0308 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,204 | $698 | Implemented |
OR0538 # 03 Y:2008 | 03 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $433,305 | $300,000 | Not Implemented |
OR0538 # 04 Y:2008 | 04 | 2008 | INSTALL SENSORS TO DETECT DEFECTS | $132,288 | $140,000 | Not Implemented |
OR0538 # 02 Y:2008 | 02 | 2008 | USE OPTIMUM THICKNESS INSULATION | $15,451 | $3,248 | Not Implemented |
OR0538 # 01 Y:2008 | 01 | 2008 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $113,818 | $1,600 | Not Implemented |
OR0538 # 05 Y:2008 | 05 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,546 | $7,085 | Not Implemented |
OR0538 # 06 Y:2008 | 06 | 2008 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $16,035 | $16,204 | Not Implemented |
TT0008 # 01 Y:2007 | 01 | 2007 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $930 | $2,000 | Not Implemented |
TT0008 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $345 | $110 | Implemented |
TT0008 # 03 Y:2007 | 03 | 2007 | INSULATE BARE EQUIPMENT | $1,200 | $300 | Implemented |
TT0008 # 04 Y:2007 | 04 | 2007 | INCREASE AMOUNT OF CONDENSATE RETURNED | $741 | $350 | Not Implemented |
TT0008 # 05 Y:2007 | 05 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,000 | $1,500 | Not Implemented |
TT0008 # 06 Y:2007 | 06 | 2007 | INSULATE BARE EQUIPMENT | $563 | $100 | Implemented |
OR0518 # 03 Y:2007 | 03 | 2007 | INSULATE BARE EQUIPMENT | $840 | $4,100 | Not Implemented |
OR0518 # 02 Y:2007 | 02 | 2007 | INSTALL OCCUPANCY SENSORS | $1,020 | $2,050 | Implemented |
OR0518 # 01 Y:2007 | 01 | 2007 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $51,600 | $120,000 | Not Implemented |
OR0477 # 04 Y:2005 | 04 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,900 | $3,100 | Implemented |
OR0477 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,455 | $11,500 | Implemented |
OR0477 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $34,000 | $34,000 | Not Implemented |
OR0477 # 05 Y:2005 | 05 | 2005 | MODIFY MATERIAL APPLICATION METHODS | $14,995 | $1,875 | Implemented |
OR0477 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $240,000 | $250,000 | Not Implemented |
OR0477 # 09 Y:2005 | 09 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,870 | $84,875 | Not Implemented |
OR0477 # 08 Y:2005 | 08 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $48,200 | $0 | Implemented |
OR0477 # 07 Y:2005 | 07 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $29,545 | $182,000 | Not Implemented |
OR0477 # 06 Y:2005 | 06 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $13,416 | $25,000 | Implemented |