IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
NAICS 4244 Grocery and Related Product Merchant Wholesalers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0308 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,204 $698 Implemented
OR0538 # 03 Y:2008 03 2008 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $433,305 $300,000 Not Implemented
OR0538 # 04 Y:2008 04 2008 INSTALL SENSORS TO DETECT DEFECTS $132,288 $140,000 Not Implemented
OR0538 # 02 Y:2008 02 2008 USE OPTIMUM THICKNESS INSULATION $15,451 $3,248 Not Implemented
OR0538 # 01 Y:2008 01 2008 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $113,818 $1,600 Not Implemented
OR0538 # 05 Y:2008 05 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,546 $7,085 Not Implemented
OR0538 # 06 Y:2008 06 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,035 $16,204 Not Implemented
TT0008 # 01 Y:2007 01 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $930 $2,000 Not Implemented
TT0008 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $345 $110 Implemented
TT0008 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $1,200 $300 Implemented
TT0008 # 04 Y:2007 04 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $741 $350 Not Implemented
TT0008 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,000 $1,500 Not Implemented
TT0008 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $563 $100 Implemented
OR0518 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $840 $4,100 Not Implemented
OR0518 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $1,020 $2,050 Implemented
OR0518 # 01 Y:2007 01 2007 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $51,600 $120,000 Not Implemented
OR0477 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,900 $3,100 Implemented
OR0477 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $28,455 $11,500 Implemented
OR0477 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $34,000 $34,000 Not Implemented
OR0477 # 05 Y:2005 05 2005 MODIFY MATERIAL APPLICATION METHODS $14,995 $1,875 Implemented
OR0477 # 01 Y:2005 01 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $240,000 $250,000 Not Implemented
OR0477 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,870 $84,875 Not Implemented
OR0477 # 08 Y:2005 08 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $48,200 $0 Implemented
OR0477 # 07 Y:2005 07 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $29,545 $182,000 Not Implemented
OR0477 # 06 Y:2005 06 2005 RECOVER AND REUSE WASTE MATERIAL $13,416 $25,000 Implemented