IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
NAICS 42442 Packaged Frozen Food Merchant Wholesalers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0536 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,017 $3,981 Not Implemented
AS0536 # 03 Y:2022 03 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,644 $1,415 Not Implemented
AS0536 # 04 Y:2022 04 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,609 $579 Not Implemented
AS0536 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $294 $77 Not Implemented
AS0536 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $43,996 $407,250 Not Implemented
SU0372 # 08 Y:2014 08 2014 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $20,087 $56,082 Not Implemented
SU0372 # 07 Y:2014 07 2014 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $305 $720 Not Implemented
SU0372 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $330 $365 Implemented
SU0372 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $849 $590 Not Implemented
SU0372 # 04 Y:2014 04 2014 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $848 $136 Not Implemented
SU0372 # 03 Y:2014 03 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,896 $380 Not Implemented
SU0372 # 02 Y:2014 02 2014 DISCONNECT BALLASTS $285 $0 Not Implemented
SU0372 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,101 $0 Not Implemented
OR0599 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,611 $12,467 Implemented
OR0599 # 02 Y:2012 02 2012 INSTALL AUTOMATIC PACKING EQUIPMENT $35,308 $0 Implemented
OR0599 # 03 Y:2012 03 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,422 $0 Not Implemented
OR0599 # 04 Y:2012 04 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,409 $0 Implemented
OR0599 # 05 Y:2012 05 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $1,964 $17,576 Not Implemented
SU0308 # 06 Y:2011 06 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $16,654 $27,750 Not Implemented
SU0308 # 05 Y:2011 05 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $628 $641 Not Implemented
SU0308 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,713 $625 Implemented
SU0308 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $8,338 $1,725 Not Implemented
SU0308 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,204 $698 Implemented
SU0308 # 01 Y:2011 01 2011 USE MAGNETIC TECHNOLOGY TO TREAT WATER $8,509 $0 Not Implemented
OR0538 # 01 Y:2008 01 2008 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $113,818 $1,600 Not Implemented