IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 44529 Other Specialty Food Stores
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0576 # 03 Y:2025 03 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $472 $18 n/a
SU0576 # 12 Y:2025 12 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $32,946 $668,352 n/a
SU0576 # 11 Y:2025 11 2025 INSTALL AN UNINTERUPTABLE POWER SUPPLY $35,256 $160,000 n/a
SU0576 # 10 Y:2025 10 2025 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $221 $899 n/a
SU0576 # 09 Y:2025 09 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $287 $403 n/a
SU0576 # 08 Y:2025 08 2025 REPAIR AND ELIMINATE STEAM LEAKS $3,215 $2,800 n/a
SU0576 # 07 Y:2025 07 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,941 $17,246 n/a
SU0576 # 06 Y:2025 06 2025 INSULATE BARE EQUIPMENT $1,088 $728 n/a
SU0576 # 05 Y:2025 05 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,825 $372 n/a
SU0576 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,295 $125 n/a
SU0576 # 02 Y:2025 02 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,743 $0 n/a
SU0576 # 01 Y:2025 01 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,976 $0 n/a
SD0449 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,392 $100 Implemented
SD0449 # 08 Y:2012 08 2012 OPTIMIZE PLANT POWER FACTOR $3,189 $5,775 Not Implemented
SD0449 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,186 $2,022 Implemented
SD0449 # 06 Y:2012 06 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $865 $1,500 Implemented
SD0449 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,629 $2,471 Not Implemented
SD0449 # 04 Y:2012 04 2012 REPAIR AND ELIMINATE STEAM LEAKS $4,456 $1,200 Implemented
SD0449 # 03 Y:2012 03 2012 REPAIR AND ELIMINATE STEAM LEAKS $1,042 $200 Implemented
SD0449 # 02 Y:2012 02 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,454 $100 Not Implemented