Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 453 | Miscellaneous Store Retailers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0265 # 02 Y:2014 | 02 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $28,983 | $9,620 | Implemented |
MI0265 # 20 Y:2014 | 20 | 2014 | INSULATE BARE EQUIPMENT | $82 | $92 | Not Implemented |
MI0265 # 19 Y:2014 | 19 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,375 | $347 | Implemented |
MI0265 # 18 Y:2014 | 18 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,758 | $80 | Implemented |
MI0265 # 17 Y:2014 | 17 | 2014 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,975 | $140 | Not Implemented |
MI0265 # 16 Y:2014 | 16 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,306 | $10,640 | Implemented |
MI0265 # 15 Y:2014 | 15 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,303 | $1,260 | Not Implemented |
MI0265 # 14 Y:2014 | 14 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,624 | $2,320 | Not Implemented |
MI0265 # 13 Y:2014 | 13 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,304 | $5,640 | Not Implemented |
MI0265 # 12 Y:2014 | 12 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,968 | $3,309 | Implemented |
MI0265 # 10 Y:2014 | 10 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,636 | $7,480 | Not Implemented |
MI0265 # 01 Y:2014 | 01 | 2014 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $27,195 | $1,120 | Not Implemented |
MI0265 # 03 Y:2014 | 03 | 2014 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $24,961 | $480 | Implemented |
MI0265 # 04 Y:2014 | 04 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,870 | $12,900 | Not Implemented |
MI0265 # 05 Y:2014 | 05 | 2014 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $24,844 | $820 | Implemented |
MI0265 # 06 Y:2014 | 06 | 2014 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $20,044 | $640 | Implemented |
MI0265 # 07 Y:2014 | 07 | 2014 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $16,496 | $160 | Implemented |
MI0265 # 08 Y:2014 | 08 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,171 | $9,500 | Not Implemented |
MI0265 # 09 Y:2014 | 09 | 2014 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $8,527 | $17,000 | Implemented |
MI0265 # 11 Y:2014 | 11 | 2014 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,236 | $320 | Not Implemented |
LL0320 # 01 Y:2009 | 01 | 2009 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $9,807 | $630 | Implemented |
LL0320 # 02 Y:2009 | 02 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,839 | $150 | Not Implemented |
LL0320 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,307 | $700 | Not Implemented |
LL0320 # 04 Y:2009 | 04 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $735 | $623 | Not Implemented |
LL0320 # 05 Y:2009 | 05 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $203 | $90 | Not Implemented |