Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
95
matching recommendationsNAICS | 488 | Support Activities for Transportation |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0003 # 08 Y:2022 | 08 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,200 | $500 | n/a |
CI0003 # 07 Y:2022 | 07 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,557 | $25 | n/a |
CI0003 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,448 | $7,600 | n/a |
CI0003 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,715 | $8,580 | n/a |
CI0003 # 01 Y:2022 | 01 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $87,136 | $114,800 | n/a |
CI0003 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $30,546 | $600 | n/a |
UF0580 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $383,709 | $1,629,000 | Not Implemented |
UF0580 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $44,200 | $57,498 | Implemented |
UF0580 # 04 Y:2022 | 04 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,115 | $20,214 | Implemented |
UF0580 # 05 Y:2022 | 05 | 2022 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $8,686 | $42,931 | Not Implemented |
UF0580 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,465 | $8,588 | Implemented |
UF0580 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,370 | $10,501 | Implemented |
UF0580 # 09 Y:2022 | 09 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,516 | $594 | Implemented |
UF0580 # 07 Y:2022 | 07 | 2022 | INSTALL OCCUPANCY SENSORS | $3,037 | $2,270 | Implemented |
UF0580 # 03 Y:2022 | 03 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $18,832 | $31,696 | Implemented |
LS0522 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,124 | $3,917 | Implemented |
LS0522 # 01 Y:2022 | 01 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $1,249 | $38 | Implemented |
LS0522 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $57 | $25 | Implemented |
LS0522 # 03 Y:2022 | 03 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $125 | $80 | Not Implemented |
WV0600 # 01 Y:2020 | 01 | 2020 | INSTALL OCCUPANCY SENSORS | $9,760 | $21,875 | Implemented |
WV0600 # 02 Y:2020 | 02 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,711 | $49,640 | Not Implemented |
WV0600 # 03 Y:2020 | 03 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,882 | $9,100 | Not Implemented |
WV0600 # 04 Y:2020 | 04 | 2020 | AIR CONDITION ONLY SPACE NECESSARY | $3,261 | $11,061 | Not Implemented |
WV0600 # 05 Y:2020 | 05 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $840 | $1,330 | Not Implemented |
WV0600 # 06 Y:2020 | 06 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $138 | $750 | Implemented |