IAC Assessment: UF0580
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0580
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2022
Principal Product Refrigeration Services
NAICS 488510 - Freight Transportation Arrangement
SIC 4731 - Freight Transportation Arrangement
Sales $5,000,000-$10,000,000
# of Employees 200
Plant Area (Sq.Ft.) 240,000
Annual Production 167,018 Pieces
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $551,987 10,687,346 kWh $0.05
Electricity Demand $75,693 18,536 kW-months/year $4.08
Electricity Fees $95,203 - $ -
TOTAL ENERGY COSTS $722,883
RECOMMENDED SAVINGS* $477,930 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,535
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$383,709
Cost:
$1,629,000
$518,250 9,966,338 $65,460 16,028 $(-115,001) (-82,863) $(-85,000) - $518,250
9,966,338
kWh
$65,460
16,028
kW-months/year
$(-115,001)
(-82,863)
MMBtu
$(-85,000)
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$44,200
Cost:
$57,498
$38,902 748,114 $5,298 1,297 - - - - $38,902
748,114
kWh
$5,298
1,297
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$18,832
Cost:
$31,696
$18,832 362,161 - - - - - - $18,832
362,161
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$11,115
Cost:
$20,214
$11,115 213,747 - - - - - - $11,115
213,747
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$8,686
Cost:
$42,931
$8,686 167,047 - - - - - - $8,686
167,047
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,465
Cost:
$8,588
$4,465 85,867 - - - - - - $4,465
85,867
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,037
Cost:
$2,270
$3,037 58,400 - - - - - - $3,037
58,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,370
Cost:
$10,501
$1,792 34,456 $578 142 - - - - $1,792
34,456
kWh
$578
142
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,516
Cost:
$594
$1,342 25,802 $174 42 - - - - $1,342
25,802
kWh
$174
42
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$477,930
Cost:
$1,803,292
$606,421 11,661,932 $71,510 17,510 $(-115,001) (-82,863) $(-85,000) - $606,421
11,661,932
kWh
$71,510
17,510
kW-months/year
$(-115,001)
(-82,863)
MMBtu
$(-85,000)
-
$
TOTAL IMPLEMENTED Savings:
$85,535
Cost:
$131,361
$79,485 1,528,547 $6,050 1,481 - - - - $79,485
1,528,547
kWh
$6,050
1,481
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes