IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
Reset
NAICS 4931 Warehousing and Storage
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS0523 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,765 $2,680 Implemented
LS0523 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $934 $25 Not Implemented
IC0272 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,198 $10,487 Not Implemented
IC0272 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,712 $3,525 Implemented
IC0272 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $562 $1,098 Implemented
IC0272 # 04 Y:2023 04 2023 AIR CONDITION ONLY SPACE NECESSARY $647 $0 Implemented
IC0272 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $341 $35 Implemented
SU0523 # 01 Y:2022 01 2022 DISCONNECT BALLASTS $4,994 $0 Not Implemented
SU0523 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,899 $250 Not Implemented
SU0523 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $659 $19 Not Implemented
SU0523 # 04 Y:2022 04 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,907 $675 Not Implemented
SU0523 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $652 $567 Not Implemented
SU0523 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $1,859 $2,600 Not Implemented
SU0523 # 07 Y:2022 07 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $125 $325 Not Implemented
SU0523 # 08 Y:2022 08 2022 REDUCE VENTILATION AIR $346 $1,265 Not Implemented
SU0523 # 09 Y:2022 09 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $8,763 $47,904 Not Implemented
CW0124 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,378 $47,373 n/a
CW0124 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,407 $100 n/a
CW0124 # 03 Y:2022 03 2022 USER BATTERY STORAGE FOR POWER QUALITY ISSUES $230,341 $287,555 n/a
CW0124 # 04 Y:2022 04 2022 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $7,380 $0 n/a
CW0124 # 07 Y:2022 07 2022 REPLACE TREATED WATER WITH WELL / SURFACE WATER $1,505 $2,582 n/a
CW0124 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $929 $1,866 n/a
CW0124 # 05 Y:2022 05 2022 MODIFY WORKLOAD $16,860 $0 n/a
AS0527 # 01 Y:2022 01 2022 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $1,896 $1,099 Implemented
AS0527 # 03 Y:2022 03 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $638 $115 Implemented