IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
Reset
NAICS 4931 Warehousing and Storage
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS0622 # 03 Y:2022 03 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,264 $240 Not Implemented
LS0622 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74,562 $14,625 Implemented
LS0622 # 05 Y:2022 05 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $684 $660 Implemented
LS0622 # 06 Y:2022 06 2022 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $3,815 $17,858 Not Implemented
IP0091 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,777 $64 Implemented
IP0091 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,005 $11 Not Implemented
IP0091 # 03 Y:2017 03 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $714 $0 Not Implemented
IP0091 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,350 $48,658 Implemented
IP0091 # 05 Y:2017 05 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,833 $11,638 Implemented
IP0091 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42 $84 Implemented
IP0091 # 07 Y:2017 07 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $298 $1,465 Not Implemented
IP0091 # 08 Y:2017 08 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,019 $47,182 Implemented
OK0936 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $46,436 $29,439 Implemented
OK0936 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,106 $35,525 Not Implemented
OK0936 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $323 $450 Implemented
OK0936 # 04 Y:2016 04 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $144 $316 Not Implemented
UK1215 # 01 Y:2013 01 2013 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,249 $2,200 Not Implemented
UK1215 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,824 $4,516 Implemented
UK1215 # 03 Y:2013 03 2013 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $4,021 $1,610 Implemented
UK1215 # 04 Y:2013 04 2013 PAY UTILITY BILLS ON TIME $1,678 $0 Implemented
OK0776 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $538 $739 Not Implemented
OK0776 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $882 $0 Not Implemented
OK0776 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $0 Not Implemented
OK0776 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $4,952 Not Implemented
OK0776 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,941 $92,541 Not Implemented