IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
NAICS 511 Publishing Industries (except Internet)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0167 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $6,319 $5,775 Not Implemented
SU0167 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $603 $116 Not Implemented
SU0167 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,750 $214 Not Implemented
SU0167 # 03 Y:2003 03 2003 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $8,152 $147 Not Implemented
SU0167 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $633 $0 Not Implemented
SU0167 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $839 $0 Implemented
CO0530 # 07 Y:2003 07 2003 INSTALL SPECTRAL REFLECTORS / DELAMP $1,200 $570 Not Implemented
CO0530 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,070 $7,760 Implemented
CO0530 # 08 Y:2003 08 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $4,089,000 $4,200,000 Not Implemented
CO0530 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $2,940 $280 Implemented
CO0530 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,370 $230 Implemented
CO0530 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,810 $1,250 Implemented
CO0530 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,370 $10,000 Implemented
CO0530 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,830 $4,140 Not Implemented
SD0329 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,811 $6,912 Not Implemented
SD0329 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,850 $15,600 Not Implemented
SD0329 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,587 $320 Not Implemented
SD0329 # 05 Y:2003 05 2003 USE PHOTOCELL CONTROLS $1,360 $1,000 Not Implemented
SD0329 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,418 $380 Implemented
SF0263 # 07 Y:2003 07 2003 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,360 $0 Not Implemented
SF0263 # 06 Y:2003 06 2003 REUSE / RECYCLE/ SELL PAPER PRODUCTS $687 $0 Not Implemented
SF0263 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,730 $20,475 Not Implemented
SF0263 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,766 $29,810 Not Implemented
SF0263 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $2,695 $4,480 Not Implemented
SF0263 # 02 Y:2003 02 2003 USE PHOTOCELL CONTROLS $766 $720 Not Implemented