IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
NAICS 5413 Architectural, Engineering, and Related Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1622 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,928 $6,120 Implemented
LS1622 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $250 $200 Not Implemented
LS1622 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $3,014 $1,496 Not Implemented
LS1622 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $3,718 $350 Implemented
LS1522 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $872 $4,215 Not Implemented
LS1522 # 04 Y:2022 04 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $702 $1,050 Not Implemented
LS1522 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $3,599 $4,375 Not Implemented
LS1522 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,079 $33,425 Implemented
LS1522 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $59,902 $3,750 Implemented
MS0395 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,342 $210,000 Not Implemented
MS0395 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,723 $18,748 Implemented
MS0395 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $677 $540 Implemented
MS0395 # 04 Y:2022 04 2022 UPGRADE OBSOLETE EQUIPMENT $2,447 $15,480 Not Implemented
OR0723 # 01 Y:2019 01 2019 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $488,033 $1,500,000 Implemented
OR0723 # 03 Y:2019 03 2019 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $5,360 $1,789 Implemented
OR0723 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $21,541 $1,027 Not Implemented
WM0104 # 06 Y:2017 06 2017 USE SYNTHETIC LUBRICANT $7,607 $650 Not Implemented
WM0104 # 03 Y:2017 03 2017 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,165 $0 Implemented
WM0104 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $11,736 $45,000 Not Implemented
WM0104 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,008 $0 Implemented
WM0104 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $15,927 $33,500 Not Implemented
WM0104 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,589 $554 Not Implemented
WM0104 # 01 Y:2017 01 2017 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $64,540 $93,226 Not Implemented
BD0434 # 03 Y:2013 03 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $15,503 $11,000 Not Implemented
BD0434 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,272 $1,475 Implemented