Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
81
matching recommendationsNAICS | 61131 | Colleges, Universities, and Professional Schools |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ORC016 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,757 | $18,123 | n/a |
ORC016 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $14,324 | $1,894 | n/a |
ORC016 # 03 Y:2025 | 03 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $90,790 | $266,383 | n/a |
ORC016 # 04 Y:2025 | 04 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $838 | $7,000 | n/a |
UU0265 # 05 Y:2025 | 05 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,338 | $5,515 | n/a |
UU0265 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,000 | $5,450 | n/a |
UU0265 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $119 | $551 | n/a |
UU0265 # 03 Y:2025 | 03 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,938 | $15,980 | n/a |
UU0265 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $546 | $1,620 | n/a |
UU0265 # 04 Y:2025 | 04 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $1,620 | $14,000 | n/a |
UU0265 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,450 | $9,720 | n/a |
UU0265 # 01 Y:2025 | 01 | 2025 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $10,697 | $45,926 | n/a |
UU0265 # 08 Y:2025 | 08 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $545 | $572 | n/a |
MUCM21 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $3,650 | $284 | n/a |
MUCM21 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,996 | $4,883 | n/a |
MUCM21 # 01 Y:2024 | 01 | 2024 | USE PHOTOCELL CONTROLS | $348 | $139 | n/a |
MUCM21 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $19,687 | $183,595 | n/a |
MUCM20 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,363 | $0 | n/a |
MUCM20 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $318 | $349 | n/a |
MUCM20 # 03 Y:2024 | 03 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $124 | $0 | n/a |
MUCM20 # 05 Y:2024 | 05 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $35 | $124 | n/a |
MUCM20 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7 | $0 | n/a |
MUCM20 # 06 Y:2024 | 06 | 2024 | ELIMINATE/REDUCE AN OPERATION | $178 | $0 | n/a |
MUCM19 # 06 Y:2024 | 06 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $49 | $111 | n/a |
MUCM19 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,679 | $0 | n/a |