Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2025 |
Principal Product | NA |
NAICS | 611310 - Colleges, Universities, and Professional Schools |
SIC | 8221 - Colleges And Universities |
Sales | <$500,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 76,000 |
Annual Production | 1 Units |
Production Hrs. Annual | 6,188 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $27,337 | 759,371 | kWh | $0.04 |
Electricity Demand | $74,759 | 4,820 | kW-months/year | $15.51 |
Natural Gas | $128,353 | 26,574 | MMBtu | $4.83 |
TOTAL ENERGY COSTS | $230,449 | |||
RECOMMENDED SAVINGS* | $20,252 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE |
Savings: $10,697 Cost: $45,926 |
$5,245 | 147,161 | $5,452 | 352 | - | - | - | - |
$5,245 147,161 kWh |
$5,452 352 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $2,450 Cost: $9,720 |
- | - | - | - | $2,450 | 507 | - | - |
- - kWh |
- - kW-months/year |
$2,450 507 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,938 Cost: $15,980 |
$1,661 | 46,653 | $277 | 18 | - | - | - | - |
$1,661 46,653 kWh |
$277 18 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL |
Savings: $1,620 Cost: $14,000 |
- | - | $1,620 | 104 | - | - | - | - |
- - kWh |
$1,620 104 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $1,338 Cost: $5,515 |
$33 | 929 | $141 | 9 | - | - | $1,164 | - |
$33 929 kWh |
$141 9 kW-months/year |
- - MMBtu |
$1,164 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,000 Cost: $5,450 |
$627 | 17,540 | $372 | 24 | - | - | - | - |
$627 17,540 kWh |
$372 24 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $546 Cost: $1,620 |
$339 | 9,470 | $207 | 13 | - | - | - | - |
$339 9,470 kWh |
$207 13 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $545 Cost: $572 |
$126 | 3,555 | $419 | 27 | - | - | - | - |
$126 3,555 kWh |
$419 27 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $119 Cost: $551 |
$19 | 527 | $101 | 6 | - | - | - | - |
$19 527 kWh |
$101 6 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $20,252 Cost: $99,334 |
$8,050 | 225,835 | $8,588 | 553 | $2,450 | 507 | $1,164 | - | $8,050 225,835 kWh |
$8,588 553 kW-months/year |
$2,450 507 MMBtu |
$1,164 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |