IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 811 Repair and Maintenance
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0363 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $829 $3,325 Implemented
LL0363 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $6,400 Implemented
LL0363 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,101 $1,200 Implemented
LL0363 # 04 Y:2012 04 2012 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,323 $420 Not Implemented
IA0474 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,989 $668 Not Implemented
IA0474 # 02 Y:2011 02 2011 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,851 $5,045 Not Implemented
IA0474 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,183 $11,760 Not Implemented
UA3003 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,018 $1,500 Implemented
UA3003 # 08 Y:2010 08 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,679 $5,534 Not Implemented
UA3003 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,940 $18,577 Not Implemented
UA3003 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $190 $129 Implemented
UA3003 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $120 $129 Implemented
UA3003 # 04 Y:2010 04 2010 USE PHOTOCELL CONTROLS $367 $1,000 Implemented
UA3003 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,872 $640 Not Implemented
UA3003 # 07 Y:2010 07 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,858 $8,376 Not Implemented
MA0646 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,508 $300 Implemented
MA0646 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,968 $3,610 Not Implemented
MA0646 # 02 Y:2009 02 2009 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $5,780 $0 Implemented
MA0646 # 01 Y:2009 01 2009 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $7,158 $8,683 Not Implemented
MA0646 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,450 $5,195 Not Implemented
MI0167 # 06 Y:2008 06 2008 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $7,627 $15,500 Implemented
MI0167 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,393 $1,210 Implemented
MI0167 # 04 Y:2008 04 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,032 $5,700 Implemented
MI0167 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $27,111 $61,964 Implemented
MI0167 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $48,995 $132,686 Implemented