Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsNAICS | 811 | Repair and Maintenance |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0363 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $829 | $3,325 | Implemented |
LL0363 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $954 | $6,400 | Implemented |
LL0363 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,101 | $1,200 | Implemented |
LL0363 # 04 Y:2012 | 04 | 2012 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,323 | $420 | Not Implemented |
IA0474 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,989 | $668 | Not Implemented |
IA0474 # 02 Y:2011 | 02 | 2011 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,851 | $5,045 | Not Implemented |
IA0474 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,183 | $11,760 | Not Implemented |
UA3003 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,018 | $1,500 | Implemented |
UA3003 # 08 Y:2010 | 08 | 2010 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,679 | $5,534 | Not Implemented |
UA3003 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,940 | $18,577 | Not Implemented |
UA3003 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $190 | $129 | Implemented |
UA3003 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $120 | $129 | Implemented |
UA3003 # 04 Y:2010 | 04 | 2010 | USE PHOTOCELL CONTROLS | $367 | $1,000 | Implemented |
UA3003 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,872 | $640 | Not Implemented |
UA3003 # 07 Y:2010 | 07 | 2010 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,858 | $8,376 | Not Implemented |
MA0646 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,508 | $300 | Implemented |
MA0646 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,968 | $3,610 | Not Implemented |
MA0646 # 02 Y:2009 | 02 | 2009 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $5,780 | $0 | Implemented |
MA0646 # 01 Y:2009 | 01 | 2009 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $7,158 | $8,683 | Not Implemented |
MA0646 # 05 Y:2009 | 05 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,450 | $5,195 | Not Implemented |
MI0167 # 06 Y:2008 | 06 | 2008 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $7,627 | $15,500 | Implemented |
MI0167 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,393 | $1,210 | Implemented |
MI0167 # 04 Y:2008 | 04 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $18,032 | $5,700 | Implemented |
MI0167 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $27,111 | $61,964 | Implemented |
MI0167 # 02 Y:2008 | 02 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $48,995 | $132,686 | Implemented |