IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
NAICS 8113 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Main
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1713 # 11 Y:2017 11 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $964 $0 Not Implemented
UK1713 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,803 $12,299 Not Implemented
UK1713 # 02 Y:2017 02 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,073 $263 Not Implemented
UK1713 # 03 Y:2017 03 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $543 $0 Not Implemented
UK1713 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,482 $2,189 Not Implemented
UK1713 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,142 $0 Not Implemented
UK1713 # 06 Y:2017 06 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $394 $683 Not Implemented
UK1713 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,530 $1,500 Not Implemented
UK1713 # 08 Y:2017 08 2017 ELIMINATE/REDUCE AN OPERATION $3,032 $0 Not Implemented
UK1713 # 09 Y:2017 09 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $309 $0 Not Implemented
UK1713 # 10 Y:2017 10 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,207 $0 Not Implemented
MI0243 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,601 $80 Implemented
MI0243 # 12 Y:2013 12 2013 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $513 $1,128 Not Implemented
MI0243 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $814 $2,255 Implemented
MI0243 # 10 Y:2013 10 2013 INSTALL OCCUPANCY SENSORS $1,228 $417 Not Implemented
MI0243 # 09 Y:2013 09 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,638 $793 Implemented
MI0243 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,653 $80 Implemented
MI0243 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,047 $10,080 Not Implemented
MI0243 # 06 Y:2013 06 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,831 $440 Not Implemented
MI0243 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,219 $1,660 Implemented
MI0243 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,171 $9,782 Not Implemented
MI0243 # 03 Y:2013 03 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,984 $19,999 Implemented
MI0243 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $24,158 $2,300 Implemented
LL0363 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $6,400 Implemented
LL0363 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,101 $1,200 Implemented