Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
NAICS 9211 Executive, Legislative, and Other General Government Support
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1098 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $75 $100 n/a
OK1098 # 02 Y:2023 02 2023 REPLACE BOILER $2,974 $78,000 n/a
OK1099 # 04 Y:2023 04 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $160 $510 n/a
OK1099 # 03 Y:2023 03 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $577 $416 n/a
OK1099 # 02 Y:2023 02 2023 AIR CONDITION ONLY SPACE NECESSARY $865 $0 n/a
OK1099 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,723 $5,897 n/a
OK1098 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $2,834 n/a
ORC009 # 04 Y:2023 04 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $83 $400 Not Implemented
ORC009 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $307 $200 Not Implemented
ORC009 # 03 Y:2023 03 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $178 $500 Not Implemented
ORC009 # 02 Y:2023 02 2023 REPLACE BOILER $1,624 $10,000 Not Implemented
ORC009 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $654 $2,000 Not Implemented
ORC008 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $668 $5,000 Not Implemented
ORC008 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,527 $4,000 Not Implemented
ORC008 # 03 Y:2023 03 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $959 $1,500 Not Implemented
ORC008 # 01 Y:2023 01 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,876 $500 Not Implemented
ORC008 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $474 $100 Not Implemented
ORC008 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,574 $500 Not Implemented
MUCM10 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $23 $14 Not Implemented
MUCM10 # 11 Y:2023 11 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,533 $5,241 Not Implemented
MUCM10 # 10 Y:2023 10 2023 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $332 $648 Not Implemented
MUCM10 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $54 $33 Not Implemented
MUCM10 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $366 $1,749 Not Implemented
MUCM10 # 07 Y:2023 07 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,177 $4,350 Not Implemented
MUCM10 # 06 Y:2023 06 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $38 $36 Not Implemented