IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 01 Agricultural Production Crops
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2203 # 01 Y:2022 01 2022 USE A DIFFERENT OR RECYCLED RAW MATERIAL $91,930 $8,070 Implemented
LS2203 # 02 Y:2022 02 2022 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $747 $300 Not Implemented
LS2203 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $179 $76 Implemented
OR0720 # 04 Y:2019 04 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,139 $2,013 Not Implemented
OR0720 # 01 Y:2019 01 2019 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $27,061 $33,855 Not Implemented
OR0720 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $31,433 $68,000 Implemented
OR0720 # 03 Y:2019 03 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,330 $1,100 Implemented
OR0720 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,138 $3,275 Not Implemented
UU0127 # 02 Y:2018 02 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,553 $55,000 Not Implemented
UU0127 # 03 Y:2018 03 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,880 $0 Not Implemented
UU0127 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $177,817 $2,000 Implemented
DL0120 # 10 Y:2014 10 2014 REPAIR OR REPLACE STEAM TRAPS $1,770 $350 Implemented
DL0120 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,260 $300 Implemented
DL0120 # 08 Y:2014 08 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $52,252 $500,000 Not Implemented
DL0120 # 07 Y:2014 07 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $44,085 $50,000 Not Implemented
DL0120 # 06 Y:2014 06 2014 INSTALL AUTOMATIC STACK DAMPER $22,042 $16,000 Not Implemented
DL0120 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $338,000 $400,000 Not Implemented
DL0120 # 04 Y:2014 04 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $176,850 $624,000 Not Implemented
DL0120 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,734 $9,000 Implemented
DL0120 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,777 $116,160 Implemented
DL0120 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $62,900 $38,400 Not Implemented