IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 0723 Crop Preparation Services For Market
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2217 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $108 $0 Implemented
UW2217 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,705 $9,295 Implemented
UW2217 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $997 $1,779 Implemented
UW2217 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $6,995 $28,937 Implemented
UW2216 # 03 Y:2022 03 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,366 $760 Implemented
UW2216 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,223 $836 Implemented
UW2216 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,121 $14,855 Implemented
OR0733 # 02 Y:2020 02 2020 USE OPTIMUM TEMPERATURE $3,294 $5,000 Implemented
OR0733 # 01 Y:2020 01 2020 Install Anaerobic Digester $30,707 $224,950 Not Implemented
OR0733 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $1,400 $4,362 Not Implemented
SF0480 # 09 Y:2016 09 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $96,947 $904,867 Implemented
SF0480 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $6,041 $31,062 Implemented
SF0480 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,524 $22,649 Not Implemented
SF0480 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,322 $10,120 Not Implemented
SF0480 # 05 Y:2016 05 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,005 $4,163 Not Implemented
SF0480 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,097 $219 Implemented
SF0480 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,403 $354 Implemented
SF0480 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $187 $0 Implemented
SF0480 # 01 Y:2016 01 2016 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,228 $0 Implemented
SF0443 # 09 Y:2014 09 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $63,378 $31,000 Implemented
SF0443 # 11 Y:2014 11 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $67,869 $444,663 Not Implemented
SF0443 # 10 Y:2014 10 2014 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $11,793 $50,140 Not Implemented
SF0443 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $9,060 $45,537 Not Implemented
SF0443 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,886 $16,744 Not Implemented
SF0443 # 05 Y:2014 05 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $57,826 $69,335 Not Implemented