IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21,002

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0601 # 04 Y:2025 04 2025 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,347 $618 n/a
AS0601 # 01 Y:2025 01 2025 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $130,000 $66,000 n/a
AS0601 # 02 Y:2025 02 2025 RECOVER AND REUSE WASTE MATERIAL $76,561 $120,000 n/a
AS0601 # 05 Y:2025 05 2025 INSULATE BARE EQUIPMENT $852 $3,546 n/a
AS0601 # 06 Y:2025 06 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $416 $942 n/a
AS0601 # 07 Y:2025 07 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $105 $180 n/a
AS0601 # 03 Y:2025 03 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $21,962 $176,288 n/a
DL0252 # 04 Y:2025 04 2025 UPGRADE CONTROLS ON COMPRESSORS $8,172 $9,000 n/a
DL0252 # 01 Y:2025 01 2025 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,602 $0 n/a
DL0252 # 05 Y:2025 05 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,540 $1,500 n/a
DL0252 # 02 Y:2025 02 2025 REDUCE VENTILATION AIR $4,684 $1,500 n/a
DL0252 # 06 Y:2025 06 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,945 $9,000 n/a
DL0252 # 03 Y:2025 03 2025 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $28,847 $27,000 n/a
DL0252 # 07 Y:2025 07 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $657 $1,000 n/a
IC0321 # 07 Y:2025 07 2025 REPAIR AND ELIMINATE STEAM LEAKS $7,389 $352 n/a
IC0321 # 02 Y:2025 02 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $93,480 $390,298 n/a
IC0321 # 03 Y:2025 03 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $730 $1,774 n/a
IC0321 # 05 Y:2025 05 2025 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,027 $1,211 n/a
IC0321 # 11 Y:2025 11 2025 INSTALL OCCUPANCY SENSORS $706 $565 n/a
IC0321 # 06 Y:2025 06 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $12,206 $5,047 n/a
IC0321 # 10 Y:2025 10 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,444 $0 n/a
IC0321 # 01 Y:2025 01 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $693 $644 n/a
IC0321 # 04 Y:2025 04 2025 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,867 $0 n/a
IC0321 # 08 Y:2025 08 2025 INSULATE BARE EQUIPMENT $19,153 $1,152 n/a
IC0321 # 09 Y:2025 09 2025 INSULATE BARE EQUIPMENT $2,006 $701 n/a