Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21,002
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0601 # 04 Y:2025 | 04 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,347 | $618 | n/a |
AS0601 # 01 Y:2025 | 01 | 2025 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $130,000 | $66,000 | n/a |
AS0601 # 02 Y:2025 | 02 | 2025 | RECOVER AND REUSE WASTE MATERIAL | $76,561 | $120,000 | n/a |
AS0601 # 05 Y:2025 | 05 | 2025 | INSULATE BARE EQUIPMENT | $852 | $3,546 | n/a |
AS0601 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $416 | $942 | n/a |
AS0601 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $105 | $180 | n/a |
AS0601 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,962 | $176,288 | n/a |
DL0252 # 04 Y:2025 | 04 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $8,172 | $9,000 | n/a |
DL0252 # 01 Y:2025 | 01 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $2,602 | $0 | n/a |
DL0252 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,540 | $1,500 | n/a |
DL0252 # 02 Y:2025 | 02 | 2025 | REDUCE VENTILATION AIR | $4,684 | $1,500 | n/a |
DL0252 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,945 | $9,000 | n/a |
DL0252 # 03 Y:2025 | 03 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $28,847 | $27,000 | n/a |
DL0252 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $657 | $1,000 | n/a |
IC0321 # 07 Y:2025 | 07 | 2025 | REPAIR AND ELIMINATE STEAM LEAKS | $7,389 | $352 | n/a |
IC0321 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $93,480 | $390,298 | n/a |
IC0321 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $730 | $1,774 | n/a |
IC0321 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,027 | $1,211 | n/a |
IC0321 # 11 Y:2025 | 11 | 2025 | INSTALL OCCUPANCY SENSORS | $706 | $565 | n/a |
IC0321 # 06 Y:2025 | 06 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $12,206 | $5,047 | n/a |
IC0321 # 10 Y:2025 | 10 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,444 | $0 | n/a |
IC0321 # 01 Y:2025 | 01 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $693 | $644 | n/a |
IC0321 # 04 Y:2025 | 04 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,867 | $0 | n/a |
IC0321 # 08 Y:2025 | 08 | 2025 | INSULATE BARE EQUIPMENT | $19,153 | $1,152 | n/a |
IC0321 # 09 Y:2025 | 09 | 2025 | INSULATE BARE EQUIPMENT | $2,006 | $701 | n/a |