Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,674
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0585 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $40 | $90 | n/a |
AS0585 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,650 | $241,007 | n/a |
AS0585 # 05 Y:2024 | 05 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $508 | $266 | n/a |
AS0585 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,103 | $583 | n/a |
AS0585 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $470 | $525 | n/a |
AS0585 # 04 Y:2024 | 04 | 2024 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,283 | $583 | n/a |
AS0585 # 03 Y:2024 | 03 | 2024 | INSTALL BACK-UP EQUIPMENT | $2,145 | $380 | n/a |
AS0585 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $371 | $322 | n/a |
NT0030 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,406 | $4,553 | n/a |
NT0030 # 05 Y:2024 | 05 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $82,128 | $10,000 | n/a |
NT0030 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $60,028 | $83,001 | n/a |
NT0030 # 06 Y:2024 | 06 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $373 | $1,424 | n/a |
NT0030 # 07 Y:2024 | 07 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,747 | $1,279 | n/a |
NT0030 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $27,850 | $0 | n/a |
NT0030 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $510 | $0 | n/a |
UU0257 # 01 Y:2024 | 01 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,024 | $16,577 | n/a |
UU0257 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,182 | $19,121 | n/a |
UU0257 # 02 Y:2024 | 02 | 2024 | INCREASE USE OF AUTOMATION | $2,630 | $12,300 | n/a |
UU0257 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,252 | $5,785 | n/a |
UU0257 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,762 | $79,343 | n/a |
LE0580 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,713 | $24,500 | n/a |
LE0580 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,743 | $17,793 | n/a |
LE0580 # 02 Y:2024 | 02 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $51,486 | $26,800 | n/a |
LE0580 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,807 | $11,787 | n/a |
LE0580 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,713 | $2,350 | n/a |