Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21,217
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0581 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $123 | $769 | n/a |
SU0581 # 02 Y:2025 | 02 | 2025 | DISCONNECT BALLASTS | $331 | $0 | n/a |
SU0581 # 07 Y:2025 | 07 | 2025 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,877 | $1,220 | n/a |
SU0581 # 01 Y:2025 | 01 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $990 | $0 | n/a |
SU0581 # 09 Y:2025 | 09 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,318 | $15,784 | n/a |
SU0581 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,336 | $0 | n/a |
SU0581 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,466 | $0 | n/a |
SU0581 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $149 | $172 | n/a |
SU0581 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,579 | $1,648 | n/a |
SU0581 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $697 | $38 | n/a |
SU0580 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $404 | $89 | n/a |
SU0580 # 07 Y:2025 | 07 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $243 | $531 | n/a |
SU0580 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $172 | $69 | n/a |
SU0580 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,986 | $0 | n/a |
SU0580 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,993 | $246 | n/a |
SU0580 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $436 | $1,102 | n/a |
SU0580 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $110 | $0 | n/a |
SU0580 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $281 | $370 | n/a |
IP0215 # 10 Y:2025 | 10 | 2025 | OPTIMIZE PLANT POWER FACTOR | $26,556 | $45,576 | n/a |
IP0215 # 03 Y:2025 | 03 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,579 | $790 | n/a |
IP0215 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $33,297 | $5,271 | n/a |
IP0215 # 07 Y:2025 | 07 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $58,146 | $9,960 | n/a |
IP0215 # 01 Y:2025 | 01 | 2025 | REDUCE VENTILATION AIR | $14,470 | $0 | n/a |
IP0215 # 08 Y:2025 | 08 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,523 | $960 | n/a |
IP0215 # 09 Y:2025 | 09 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $10,982 | $16,152 | n/a |