Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,442
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2408 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,047 | $135 | n/a |
LS2408 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $37,002 | $144,549 | n/a |
LS2408 # 03 Y:2024 | 03 | 2024 | REPLACE BOILER | $57,645 | $247,500 | n/a |
IC0300 # 10 Y:2024 | 10 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,457 | $0 | n/a |
IC0300 # 03 Y:2024 | 03 | 2024 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $14,349 | $0 | n/a |
IC0300 # 15 Y:2024 | 15 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $481 | $1,052 | n/a |
IC0300 # 09 Y:2024 | 09 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,041 | $3,140 | n/a |
IC0300 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $772 | $1,100 | n/a |
IC0300 # 11 Y:2024 | 11 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $6,508 | $474 | n/a |
IC0300 # 12 Y:2024 | 12 | 2024 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $188 | $0 | n/a |
IC0300 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,727 | $3,127 | n/a |
IC0300 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,452 | $129 | n/a |
IC0300 # 13 Y:2024 | 13 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,410 | $0 | n/a |
IC0300 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,186 | $96,427 | n/a |
IC0300 # 14 Y:2024 | 14 | 2024 | INCREASE AMOUNT OF CONDENSATE RETURNED | $18,674 | $14,800 | n/a |
IC0300 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $765 | $658 | n/a |
IC0300 # 06 Y:2024 | 06 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $4,021 | $2,910 | n/a |
IC0300 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $930 | $1,854 | n/a |
IC0302 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $320 | $0 | n/a |
IC0302 # 09 Y:2024 | 09 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,215 | $4,414 | n/a |
IC0302 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $215 | $1,256 | n/a |
IC0302 # 10 Y:2024 | 10 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,478 | $12,801 | n/a |
IC0302 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $411 | $0 | n/a |
IC0302 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,025 | $350 | n/a |
IC0302 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $1,385 | $1,118 | n/a |